Connecticut Seal

General Assembly

Amendment

 

February Session, 2010

LCO No. 5418

   
 

*SB0012405418SRO*

Offered by:

 

SEN. MCKINNEY, 28th Dist.

REP. LYDDY, 106th Dist.

 

To: Subst. Senate Bill No. 124

File No. 381

Cal. No. 256

After the last section, add the following and renumber sections and internal references accordingly:

"Sec. 501. (Effective from passage) The Commissioner of Environmental Protection shall not make a determination of need or approve any permit application that is pending or filed as of the effective date of this section for a new solid waste facility located within one thousand feet of a primary or secondary aquifer, or the expansion of any such existing facility, until there exists a need for such additional capacity, as determined by the Solid Waste Management Plan. "