Sec. 22a-342. (Formerly Sec. 25-4a). Establishment of stream channel encroachment lines. Permits for encroachments, required findings. Fees. The commissioner shall establish, along any tidal or inland waterway or flood-prone area considered
for stream clearance, channel improvement or any form of flood control or flood alleviation measure, lines beyond which, in the direction of the waterway or flood-prone area,
no obstruction, encroachment or hindrance shall be placed by any person, and no such
obstruction, encroachment or hindrance shall be maintained by any person unless authorized by said commissioner. The commissioner shall issue or deny permits upon applications for establishing such encroachments based upon his findings of the effect of such
proposed encroachments upon the flood-carrying and water storage capacity of the waterways and flood plains, flood heights, hazards to life and property, and the protection
and preservation of the natural resources and ecosystems of the state, including but not
limited to ground and surface water, animal, plant and aquatic life, nutrient exchange,
and energy flow, with due consideration given to the results of similar encroachments
constructed along the reach of waterway. Each application for a permit shall be accompanied by a fee as follows: (1) No change in grades and no construction of above-ground
structures, three hundred seventy-five dollars; (2) a change in grade and no construction
of above-ground structures, seven hundred fifty dollars; and (3) a change in grade and
above-ground structures or buildings, three thousand seven hundred fifty dollars.
(1963, P.A. 435, S. 1; 1971, P.A. 872, S. 45; P.A. 73-590, S. 2, 3; P.A. 90-231, S. 11, 28; P.A. 91-369, S. 26, 36; P.A.
98-209, S. 5; June 30 Sp. Sess. P.A. 03-6, S. 127.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; P.A. 73-590 clarified applicable waterways as "tidal or inland" and required that findings contain effect of
encroachment upon water storage capacity, floodplains and upon protection and preservation of natural resources and
ecosystems; Sec. 25-4a transferred to Sec. 22a-342 in 1983; P.A. 90-231 required the payment of application fees and
provided that on and after July 1, 1995, the fees shall be prescribed by regulations; P.A. 91-369 restated commissioner's
authority to adopt regulations setting the fees required by this section; P.A. 98-209 prohibited hindrances beyond stream
channel encroachment lines and prohibited maintenance of obstructions, encroachments or hindrances beyond such lines;
June 30 Sp. Sess. P.A. 03-6 increased permit application fees by fifty per cent in Subdivs. (1), (2) and (3) and deleted
provisions re amount of fees prescribed by regulation, effective August 20, 2003.
See Sec. 7-147 re municipal ordinances.
See Sec. 22a-27i re exemption of municipality for one year.
See Sec. 22a-360 re boundaries for structures.
Annotation to former section 25-4a:
Cited. 179 C. 250, 252.
Annotations to present section:
Cited. 215 C. 616, 618, 619, 621, 622, 625-630, 632. Cited. 235 C. 448, 457. Cited. 239 C. 124.
Cited. 24 CA 163, 166.
Sec. 22a-342a. Civil penalty. Any person who places any obstruction, encroachment or hindrance within any stream channel encroachment line established by the
Commissioner of Environmental Protection pursuant to section 22a-342 without a permit issued under said section, or is maintaining any such obstruction, encroachment or
hindrance placed without such a permit, or in violation of the terms and conditions of
such permit shall be liable for a civil penalty of not more than one thousand dollars for
each offense. Each violation shall be a separate and distinct offense and in the case of
a continuing violation, each day's continuance thereof shall be deemed to be a separate
and distinct offense. The Commissioner of Environmental Protection may request the
Attorney General to bring a civil action in the superior court for the judicial district of
Hartford to seek imposition and recovery of such civil penalty.
(P.A. 87-438, S. 2; P.A. 88-230, S. 1, 12; 88-364, S. 42, 123; P.A. 90-98, S. 1, 2; P.A. 93-142, S. 4, 7, 8; P.A. 95-220,
S. 4-6; P.A. 98-209, S. 6.)
History: P.A. 88-230 replaced "judicial district of Hartford-New Britain at Hartford" with "judicial district of Hartford",
effective September 1, 1991; P.A. 88-364 made technical change; P.A. 90-98 changed the effective date of P.A. 88-230
from September 1, 1991, to September 1, 1993; P.A. 93-142 changed the effective date of P.A. 88-230 from September
1, 1993, to September 1, 1996, effective June 14, 1993; P.A. 95-220 changed the effective date of P.A. 88-230 from
September 1, 1996, to September 1, 1998, effective July 1, 1995; P.A. 98-209 prohibited maintenance of obstructions,
encroachments or hindrances beyond stream channel encroachment lines without a permit.
Cited. 215 C. 616, 625.
Sec. 22a-343. (Formerly Sec. 25-4b). Determination of lines. The commissioner, in establishing such encroachment lines, shall base their location on the boundaries of the area which would be inundated by a flood similar in size to one or more
recorded floods which have caused extensive damages in such area or on a size of flood
computed by accepted methods applicable generally throughout the state or a region
thereof. The determination of the size of the flood and the boundaries of the inundated
area shall take into consideration the effects of probable future developments. The position of the lines may vary from the boundaries of the inundated area so as to minimize
the area of land to be regulated when a portion of the inundated area does not contribute
to the flood-carrying capacity of the waterway. The position of the lines shall, insofar
as practical, equitably affect riparian properties and interests depending upon existing
topography and shall be interdependent throughout the reaches of the waterway, and
shall conform with the requirements of the federal government imposed as conditions
for the construction of flood control projects. When the existing waterway, because of
natural or man-made constrictions, is such that such lines cannot be established by
standard engineering methods, a channel may be adopted, whereby the removal of such
constrictions may be anticipated so that reasonable lines can be established by methods
applicable to the state generally. When the flood boundary falls along the channel banks,
the lines shall be placed at the top of the bank.
(1963, P.A. 435, S. 2; 1971, P.A. 872, S. 46.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner; Sec. 25-4b transferred to Sec. 22a-343 in 1983.
Annotation to former section 25-4b:
Cited. 179 C. 250, 252.
Annotation to present section:
Cited. 215 C. 616, 625, 626.
Sec. 22a-344. (Formerly Sec. 25-4c). Public hearing. Order establishing lines.
The commissioner or a hearing examiner, designated by him, shall hold a public hearing
to review the proposed encroachment lines along any waterway or flood-prone area
prepared in accordance with section 22a-343 with due consideration of the equities
involved. Notice of such hearing shall be given by mail to all property owners known
to be affected by the proposed lines and shall be published three times in a newspaper
having a general circulation in the area involved. The commissioner shall take appropriate steps to inform the public and the interested property owners of the proposals by
making suitable maps available in the office of the town clerk of the town wherein
the property is located for inspection, study and discussion. After consideration of all
testimony and pertinent facts at his disposal and with due regard for the public interest
and the rights of respective property owners, the commissioner may approve the location
of the lines as proposed or as modified and thereupon shall establish such lines by order.
Such order shall be recorded with appropriate maps with the town clerks of the respective
towns involved. Notice of such order establishing or altering such line or lines shall be
mailed to all persons known to be affected thereby and shall be published three times
in a newspaper having a general circulation in the area involved. Any person aggrieved
by any order of the commissioner as to the location of such line may appeal therefrom,
in accordance with the provisions of section 4-183, except venue for such appeal shall
be in the judicial district of New Britain.
(1963, P.A. 435, S. 3; 1971, P.A. 872, S. 47; P.A. 76-436, S. 465, 681; P.A. 77-603, S. 105, 125; P.A. 80-483, S. 162,
186; P.A. 88-230, S. 1, 12; P.A. 90-98, S. 1, 2; P.A. 93-142, S. 4, 7, 8; P.A. 95-220, S. 4-6; P.A. 99-215, S. 24, 29.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner and authorized designated hearing examiners to conduct hearings; P.A. 76-436 replaced court of common
pleas with superior court, effective July 1, 1978; P.A. 77-603 replaced previous appeal provisions with requirement that
appeals be made in accordance with Sec. 4-183, but retained venue in Hartford county; P.A. 80-483 replaced Hartford
county with judicial district of Hartford-New Britain; Sec. 25-4c transferred to Sec. 22a-344 in 1983; P.A. 88-230 replaced
"judicial district of Hartford-New Britain" with "judicial district of Hartford", effective September 1, 1991; P.A. 90-98
changed the effective date of P.A. 88-230 from September 1, 1991, to September 1, 1993; P.A. 93-142 changed the effective
date of P.A. 88-230 from September 1, 1993, to September 1, 1996, effective June 14, 1993; P.A. 95-220 changed the
effective date of P.A. 88-230 from September 1, 1996, to September 1, 1998, effective July 1, 1995; P.A. 99-215 replaced
"judicial district of Hartford" with "judicial district of New Britain", effective June 29, 1999.
See Sec. 52-192 re precedence of appeal.
Annotation to former section 25-4c:
Cited. 179 C. 250, 252.
Annotation to present section:
Cited. 215 C. 616, 625.
Sec. 22a-345. (Formerly Sec. 25-4d). Nonconforming uses. Taking of existing
structures by commissioner. When the establishment of such lines in accordance with
sections 22a-342 to 22a-348, inclusive, requires that they be placed through portions of
or so as to include entire existing structures within the regulated area, such structures
or portions thereof shall be considered as a nonconforming use of the area, except that,
if the structure is destroyed or damaged to the extent of more than fifty per cent of the
fair market value, such structure shall be replaced or repaired only through a permit
from the commissioner, provided the commissioner may define types of structures which
may be reconstructed within such lines without a permit. Whenever the commissioner
finds that existing structures or encroachments within the lines established constitute a
hazard to life and property in the event of flood, he is empowered to take such land and
structure as provided by chapter 835 and cause removal of such encroachment.
(1963, P.A. 435, S. 4; 1971, P.A. 872, S. 48.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4d transferred to Sec. 22a-345 in 1983.
Cited. 215 C. 616, 625.
Sec. 22a-346. (Formerly Sec. 25-4e.) Encroachment as nuisance. After the commissioner has established such lines on any waterway or flood plain, any obstruction,
encroachment or hindrance of any nature placed within such lines in the direction of
the waterway, without specific authorization of the commissioner, shall be considered a
public nuisance. The Attorney General shall, at the request of the commissioner, institute
proceedings to enjoin and abate any such nuisance.
(1963, P.A. 435, S. 5; 1971, P.A. 872, S. 49.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4e transferred to Sec. 22a-346 in 1983.
See Sec. 22a-362 re structures or fill.
Cited. 215 C. 616, 625.
Sec. 22a-347. (Formerly Sec. 25-4f). Regulations and procedures. The commissioner may, subject to the provisions of subsection (a) of section 22a-6, adopt, revise
and amend such rules, regulations and procedures as are necessary to carry out the
purposes of sections 22a-342 to 22a-348, inclusive, in the public interest.
(1963, P.A. 435, S. 6; 1971, P.A. 872, S. 50.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner and added phrase limiting commissioner's power to make and revise regulations and procedures; Sec. 25-4f transferred to Sec. 22a-347 in 1983.
See chapter 54 (Sec. 4-166 et seq.) re administrative procedure.
Cited. 215 C. 616, 625.
Sec. 22a-348. (Formerly Sec. 25-4g). Municipal powers. (a) The provisions of
sections 22a-342 to 22a-348, inclusive, shall not affect the provision of section 7-147
authorizing any town, city or borough to establish such lines within its jurisdiction prior
to the establishment of lines by the commissioner, provided the commissioner may alter
any lines, however established, upon finding such alterations are necessary to effectuate
the purpose of said sections 22a-342 to 22a-348, inclusive, and section 25-69. If the
commissioner has established lines within a municipality, the commissioner shall have
exclusive jurisdiction over any encroachments within such lines.
(b) Notwithstanding the provisions of subsection (a), any town, city or borough
may establish such lines at any time to comply with the eligibility provisions of the
National Flood Insurance Program (44 CFR Part 59 et seq.).
(1963, P.A. 435, S. 7; 1971, P.A. 872, S. 51; P.A. 84-16; P.A. 88-327, S. 2, 3.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4g transferred to Sec. 22a-348 in 1983; P.A. 84-16 added Subsec. (b) authorizing towns to establish
lines to comply with the National Flood Insurance Program; P.A. 88-327 added provisions to Subsec. (a) re exclusive
jurisdiction of commissioner of environmental protection.
Cited. 215 C. 616, 625.
Sec. 22a-349. (Formerly Sec. 25-4h). Permitted agricultural use. The provisions of sections 22a-342 to 22a-348, inclusive, shall not be deemed to restrict agricultural or farming uses of lands located within the stream channel encroachment lines
including the building of fences, provided this section shall not apply to farm buildings
and farm structures.
(P.A. 75-114, S. 1, 2.)
History: Sec. 25-4h transferred to Sec. 22a-349 in 1983.
Cited. 215 C. 616, 618, 621, 622, 625-627, 629-632. Cited. 239 C. 124.
Cited. 24 CA 163, 167.
Sec. 22a-349a. General permits for minor activities. Regulations. (a) The Commissioner of Environmental Protection may issue a permit for any minor activity regulated under sections 22a-342 to 22a-349, inclusive, except for any activity covered by
an individual permit, if the commissioner determines that such activity would cause
minimal environmental effects when conducted separately and would cause only minimal cumulative environmental effects, and will not cause any increase in flood heights
or in the potential for flood damage or flood hazards. Such activities may include routine
minor maintenance and routine minor repair of existing structures; replacement of existing culverts; installation of water monitoring equipment, including but not limited to
staff gauges, water recording and water quality testing devices; removal of unauthorized
solid waste; extension of existing culverts and stormwater outfall pipes; placement of
greenhouses or hoophouses lacking concrete foundations; construction of irrigation and
utility lines; and safety improvements with minimal environmental impacts within existing rights-of-way of existing roadways. Any person, firm or corporation conducting
an activity for which a general permit has been issued shall not be required to obtain
an individual permit under any other provision of said sections 22a-342 to 22a-349,
inclusive, except as provided in subsection (c) of this section. A general permit shall
clearly define the activity covered thereby and may include such conditions and requirements as the commissioner deems appropriate, including but not limited to, management
practices and verification and reporting requirements. The general permit may require
any person, firm or corporation, conducting any activity under the general permit to
report, on a form prescribed by the commissioner, such activity to the commissioner
before it shall be covered by the general permit. The commissioner shall prepare, and
shall annually amend, a list of holders of general permits under this section, which list
shall be made available to the public.
(b) Notwithstanding any other procedures specified in said sections 22a-342 to 22a-349, inclusive, any regulations adopted thereunder, and chapter 54, the commissioner
may issue, revoke, suspend or modify a general permit in accordance with the following
procedures: (1) The commissioner shall publish in a newspaper having a substantial
circulation in the affected area or areas notice of intent to issue a general permit; (2) the
commissioner shall allow a comment period of thirty days following publication of such
notice during which interested persons may submit written comments concerning the
permit to the commissioner and the commissioner shall hold a public hearing if, within
said comment period, he receives a petition signed by at least twenty-five persons; (3)
the commissioner may not issue the general permit until after the comment period; and
(4) the commissioner shall publish notice of any permit issued in a newspaper having
substantial circulation in the affected area or areas. Any person may request that the
commissioner issue, modify or revoke a general permit in accordance with this subsection.
(c) Subsequent to the issuance of a general permit, the commissioner may require
any person, firm or corporation, to apply for an individual permit under the provisions
of said sections 22a-342 to 22a-349, inclusive, for all or any portion of the activities
covered by the general permit, if in the commissioner's judgment the purposes and
policies of such sections would be best served by requiring an application for an individual permit. The commissioner may require an individual permit under this subsection
only if the affected person, firm or corporation has been notified in writing that an
individual permit is required. The notice shall include a brief statement of the reasons
for the decision and a statement that upon the date of issuance of such notice the general
permit as it applies to the individual activity will terminate.
(d) Any general permit issued under this section shall require that any person, firm
or corporation intending to conduct an activity covered by such general permit shall, at
least sixty days before initiating such activity, give written notice of such intention to
the inland wetlands agency, zoning commission, planning commission or combined
planning and zoning commission and conservation commission of any municipality
which will or may be affected by such activity, and to the department which shall make
such notices available to the public. The general permit shall specify the information
which must be contained in the notice. An inland wetlands agency, planning and zoning
commission, conservation commission or any person may submit written comments to
the commissioner concerning such activity not later than twenty-five days prior to the
date that the activity is proposed to begin.
(e) The commissioner may adopt regulations in accordance with the provisions of
chapter 54 to carry out the purposes of this section.
(P.A. 91-263, S. 4, 8; P.A. 92-162, S. 16, 25.)
History: P.A. 92-162 amended Subsec. (d) to provide that any person may submit comments to the commissioner
concerning regulated activities permitted under this section prior to commencement of such activities and changed the
deadline for such comments from thirty days prior to such commencement to twenty-five days.
Sec. 22a-350. (Formerly Sec. 25-5). Study of conditions relating to flood control. Said commissioner shall make a comprehensive study of all conditions, wherever
located, in any way relating to: (a) The control of flood waters, the establishment of
encroachment limits along waterways to provide reasonable flood discharge capacity,
the flood control features of existing and future dams and reservoirs, the removal of
stream obstructions caused by flood waters, the extent of damage caused by flood waters
to property of the state, its political subdivisions, industry and agriculture and any necessary means or method by which such damage may be repaired or provided against in
case of future floods; (b) river and harbor improvements, obstructions or encroachments
in any of the navigable waters or tributaries within the state, and (c) any matters kindred
thereto.
(1949 Rev., S. 3569; November, 1955, S. N192; 1971, P.A. 872, S. 52.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner; Sec. 25-5 transferred to Sec. 22a-350 in 1983.
Annotation to former section 25-5:
Cited. 21 CS 407.
Annotation to present section:
Cited. 215 C. 616, 625.
Sec. 22a-351. (Formerly Sec. 25-5a). Inventory of groundwater and surface
water resources. Study of water policy needs. (a) The Commissioner of Environmental Protection is authorized to carry out a ten-year program of detailed geological and
hydrological studies and groundwater investigations and reports throughout the state
by means of test drillings, observation wells and any other means necessary to determine
groundwater resources, quality and potential supplies, and establish a complete inventory of groundwater resources of the entire state. The commissioner shall endeavor to
gather and utilize any data or information obtained by any other state or federal agency
or any municipal or private utility with a view toward coordination of all work of such
similar nature.
(b) The commissioner is authorized to carry out a program of studies and investigations necessary to establish a complete inventory of surface water resources of the entire
state and shall collect, utilize and coordinate the data and activities of any other state
or federal agency or municipal or private utility or corporation.
(c) The commissioner may negotiate with any property owner such terms,
agreements or contracts as may be necessary or convenient in connection with carrying
out the duties required by this section.
(1959, P.A. 594; 1971, P.A. 872, S. 53.)
History: 1971 act replaced water resources commission with environmental protection commissioner; Sec. 25-5a transferred to Sec. 22a-351 in 1983.
Cited. 215 C. 616, 625.
Sec. 22a-352. (Formerly Sec. 25-5b). Long-range plan for management of
water resources. (a) The Department of Environmental Protection, the Department of
Public Health and the Office of Policy and Management, shall establish a continuing
planning process and shall prepare and periodically update jointly a state-wide long-range plan for the management of the water resources of the state. In carrying out such
preparation the aforesaid agencies shall: (1) Design a unified planning program and
budget; (2) coordinate regional water and sewer facilities plans and provide technical
or financial assistance to regional planning agencies in the preparation of regional water
and sewer facilities plans which are necessary as guidelines for the planning and designing of local and interlocal facilities and which are required by the federal government
as a prerequisite for grants to municipalities for the construction of certain water and
sewer facilities.
(b) The state-wide water resources plan shall: (1) Identify the quantities and qualities of water that could be available to specific areas under feasible distribution; (2)
identify present and projected demands for water for specific areas; (3) recommend the
utilization of the state's water resources, including surface and subsurface water, for
their greatest benefits; (4) make recommendations for such major engineering works
or special districts which may be necessary, including the need, timing and general cost
thereof; (5) recommend land use and other measures where appropriate to insure the
desired quality and abundance of water; (6) take into account desired recreational, agricultural, industrial and commercial use of water bodies; and (7) seek to incorporate
regional and local plans and programs for water use and management and plans for
water and sewerage facilities in the state-wide plan.
(c) Upon completion of each planning document and when adopted by the Commissioner of Environmental Protection, the Commissioner of Public Health and the Secretary of the Office of Policy and Management, said final plan shall be submitted to the
General Assembly.
(1967, P.A. 477, S. 1-3; 1969, P.A. 628, S. 12; 1971, P.A. 872, S. 54; P.A. 73-555, S. 1, 10; 73-679, S. 39, 40, 43; P.A.
75-537, S. 52, 55; P.A. 77-614, S. 19, 323, 610; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58.)
History: 1969 act replaced Connecticut development commission with office of state planning in Subsec. (a), deleted
reference to Connecticut interregional planning program in Subdiv. (1) and replaced the constituent agencies of that program
with water resources commission, commissioner of health, state board of fisheries and game and director of the office of
state planning in Subsec. (c), deleting obsolete provision requiring submission of progress report in lieu of plan if plan is
not completed and approved by January 15, 1969; 1971 act replaced water resources commission with commissioner and
department of environmental protection and deleted references to board of fisheries and game in Subsecs. (a) and (c); P.A.
73-555 clarified that planning process should be continuing and that plan should be updated periodically; P.A. 73-679
replaced office of state planning with planning and budgeting division, department of finance and control and the director
of that office with a division managing director; P.A. 75-537 replaced planning and budgeting division, department of
finance and control and its managing director with commissioner and department of planning and energy policy; P.A. 77-614 replaced commissioner and department of planning and energy policy with office of policy and management and its
secretary and, effective January 1, 1979, replaced commissioner and department of health with commissioner and department of health services; Sec. 25-5b transferred to Sec. 22a-352 in 1983; P.A. 93-381 replaced department and commissioner
of health services with department and commissioner of public health and addiction services, effective July 1, 1993;
P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction Services with Commissioner and
Department of Public Health, effective July 1, 1995.
Cited. 215 C. 616, 625.
Sec. 22a-353. (Formerly Sec. 25-5c). Duties of Secretary of the Office of Policy
and Management. Grants to regional planning agencies. Federal funds. The Secretary of the Office of Policy and Management or his designee shall be the contractor for
the purposes of sections 22a-352 to 22a-354, inclusive, and may engage consultants or
arrange for other technical assistance to implement the work program, and within the
limitations of the budget, developed under subdivision (1) of subsection (a) of section
22a-352. The Secretary of the Office of Policy and Management, or his designee may
make grants to any regional planning agency established under authority of chapter 127,
any regional council of elected officials in any region where there is no regional planning
agency or any regional council of governments organized under sections 4-124i to 4-124p, inclusive, for the purpose of preparing regional plans for water and sewer facilities.
Such grants may cover retroactively work initiated by a regional planning agency after
January 1, 1967. The Secretary of the Office of Policy and Management or his designee
shall apply for any and all funds available from the federal government to support such
planning work and shall see that regional planning agencies, regional councils of elected
officials or councils of government receiving state grants take similar advantage of
available federal funds in order to reduce expenditure of funds appropriated under section 22a-354, provided utilization of such federal funds shall not unduly delay the conduct of said study.
(1967, P.A. 477, S. 4; 1969, P.A. 628, S. 13; P.A. 73-679, S. 41, 43; P.A. 75-537, S. 53, 55; P.A. 77-614, S. 19, 610.)
History: 1969 act transferred powers formerly held by Connecticut development commission to director of the office
of state planning contingent upon approval of commissioner of finance and control; P.A. 73-679 replaced director of the
office of state planning with managing director, planning and budgeting division, department of finance and control or his
designee and made provisions applicable to regional councils of elected officials or regional councils of government; P.A.
75-537 replaced managing director, planning and budgeting division, department of finance and control with commissioner
of planning and energy policy; P.A. 77-614 replaced commissioner of planning and energy policy with secretary of the
office of policy and management; Sec. 25-5c transferred to Sec. 22a-353 in 1983.
Cited. 215 C. 616, 625.
Sec. 22a-354. (Formerly Sec. 25-5d). Appropriation of bond proceeds. Notwithstanding the provisions of section 22a-446, one million five hundred thousand dollars of the proceeds of the sale of bonds issued under said section may be used at the
discretion of the State Bond Commission for the purpose of sections 22a-352 to 22a-354, inclusive.
(1967, P.A. 477, S. 5.)
History: Sec. 25-5d transferred to Sec. 22a-354 in 1983.
Cited. 215 C. 616, 625.
Sec. 22a-354a. "Existing well fields" and "potential well fields", defined. As
used in sections 22a-354b to 22a-354f, inclusive, "existing well fields" means well fields
in use by a public water supply system when mapping is required pursuant to section
22a-354c and "potential well fields" means those well fields identified as future sources
of supply in the water supply plan of the public water supply system approved pursuant
to section 25-32d.
(P.A. 88-324, S. 1.)
Cited. 215 C. 616, 625.
Sec. 22a-354b. Standards for modeling and mapping of locations of aquifers.
The Commissioner of Environmental Protection shall establish standards for two levels
of modeling and mapping of the location in aquifers of well field areas, zones of contribution and recharge areas. Standards for mapping at level A shall be established by regulations adopted by the commissioner in accordance with the provisions of chapter 54,
except that notice of intent to adopt such regulations shall be published on or before
July 1, 1990, and shall be based on hydrogeological data of aquifer geometry, hydraulic
characteristics and connection to surface water features, groundwater level data and
surface water discharge information for model calibration and pump test data for model
verification. Standards for mapping at level B shall be established by guidelines developed by the commissioner and shall be based on existing geologic mapping of known
aquifer characteristics, limited field verification, the location of existing and potential
well fields and pumping rates.
(P.A. 88-324, S. 2; P.A. 90-275, S. 7, 9.)
History: P.A. 90-275 required the notice of intent to adopt the regulations to be published on or before July 1, 1990.
Cited. 215 C. 616, 625.
Sec. 22a-354c. Mapping of well fields by water companies. (a) On or before July
1, 1990, each public or private water company serving one thousand or more persons
shall map at level B all areas of contribution and recharge areas for its existing wells
located in stratified drift aquifers. Not later than three years after the adoption by the
Commissioner of Environmental Protection of a model municipal aquifer protection
ordinance under section 22a-354l, each public and private water company serving ten
thousand or more persons shall map at level A all areas of contribution and recharge
areas for its existing wells located in stratified drift aquifers. The Commissioner of
Environmental Protection may map at level A and at level B all areas of contribution
and recharge areas for existing wells located in stratified drift aquifers that are used by
any public or private water company serving less than one thousand persons.
(b) Each public or private water company serving ten thousand or more persons
shall map all areas of contribution and recharge areas for potential wells that are located
within stratified drift aquifers identified as future sources of water supply to meet their
needs in accordance with the plan submitted pursuant to section 25-33h, (1) at level B
two years after approval of such plan and (2) at level A four years after approval of
such plan. The Commissioner of Environmental Protection shall identify and make
recommendations for mapping, or shall map, all remaining significant areas of contribution and recharge areas for potential wells located in stratified drift aquifers not identified
by a public or private water company as a potential source of water supply within the
region of an approved plan. Mapping of any other area of contribution and recharge
areas for potential wells located in stratified drift aquifers by the commissioner shall be
completed at a time determined by the commissioner.
(P.A. 88-324, S. 3; P.A. 89-305, S. 22, 32; P.A. 90-275, S. 5, 9; P.A. 91-386, S. 1; May Sp. Sess. P.A. 92-11, S. 63,
70; P.A. 93-337, S. 3.)
History: P.A. 89-305 specified that mapping is required of areas of contribution and recharge areas for wells located
in stratified drift aquifers and made technical changes; P.A. 90-275 deleted the requirement that the areas to be mapped
at level B by water companies be within their water supply service area, authorized the commissioner to map at level A
and at level B areas of contribution and recharge areas for wells located in stratified drift aquifers which are used by water
companies serving less than one thousand persons and required the commissioner to either map or make recommendations
for mapping all remaining significant areas of contribution and recharge areas for potential wells located in stratified drift
aquifers not identified by water companies as a potential source of water supply; P.A. 91-386 amended Subsec. (a) to
extend the time for mapping at level A from July 1, 1992, to July 1, 1994; May Sp. Sess. P.A. 92-11 amended Subsec. (a)
to change date from July 1, 1994, to January 1, 1996, for aquifer mapping; P.A. 93-337 amended Subsec. (a) to change
deadline for mapping from January 1, 1996, to three years after adoption by commissioner of model ordinance under Sec.
22a-354l.
Cited. 215 C. 616, 625.
Sec. 22a-354d. Completion of mapping of well fields. The mapping of aquifers
by a public or private water company at level B and level A required pursuant to section
22a-354c shall not be deemed to be complete unless approved by the Commissioner of
Environmental Protection.
(P.A. 88-324, S. 4.)
Cited. 215 C. 616, 625.
Sec. 22a-354e. Inventory of land uses overlying aquifers. Not later than three
months after approval of the Commissioner of Environmental Protection of mapping
of aquifers at level B, each municipal aquifer protection agency authorized pursuant to
section 22a-354o shall inventory land uses overlying the mapped zone of contribution
and recharge areas of such aquifers in accordance with guidelines established by the
commissioner pursuant to section 22a-354f. Such inventory shall be completed not more
than one year after authorization of the agency.
(P.A. 88-324, S. 5; P.A. 89-305, S. 27, 32.)
History: P.A. 89-305 required inventory to be completed within a year of agency authorization and made technical
changes.
Cited. 215 C. 616, 625.
Sec. 22a-354f. Guidelines for inventory. The Commissioner of Environmental
Protection shall develop guidelines to be used by municipal boards or commissions in
conducting the inventory of land uses required under section 22a-354e.
(P.A. 88-324, S. 6.)
Cited. 215 C. 616, 625.
Sec. 22a-354g. Findings. The General Assembly finds that aquifers are an essential natural resource and a major source of public drinking water; that reliance on groundwater will increase because opportunities for development of new surface water supplies
are diminishing due to the rising cost of land and increasingly intense development; that
numerous drinking water wells have been contaminated by certain land use activities
and other wells are now threatened; that protection of existing and future groundwater
supplies demands greater action by state and local government; that a groundwater
protection program requires identification and delineation of present and future water
supplies in stratified drift aquifers supplying drinking water wells; that a comprehensive
and coordinated system of land use regulations should be established that includes state
regulations protecting public drinking water wells located in stratified drift aquifers;
that municipalities with existing or proposed public drinking water wells in stratified
drift aquifers should designate aquifer protection agencies, and that the state should
provide technical assistance and education programs on aquifer protection to ensure a
plentiful supply of public drinking water for present and future generations.
(P.A. 89-305, S. 1, 32.)
Sec. 22a-354h. Definitions. For the purposes of sections 19a-37, 22-6c, 22a-354c,
22a-354e, 22a-354g to 22a-354bb, inclusive, 25-32d, 25-33h, 25-33n and subsection
(a) of section 25-84:
(1) "Regulated activity" means any action, process or condition which the Commissioner of Environmental Protection determines, by regulations adopted in accordance
with section 22a-354i, to involve the production, handling, use, storage or disposal of
material that may pose a threat to groundwater in an aquifer protection area, including
structures and appurtenances utilized in conjunction with the regulated activity;
(2) "Commissioner" means the Commissioner of Environmental Protection;
(3) "Well field" means the immediate area surrounding a public drinking water
supply well or group of wells;
(4) "Area of contribution" means the area where the water table or other potentiometric surface is lowered due to the pumping of a well and groundwater flows directly
to the well;
(5) "Recharge area" means the area from which groundwater flows directly to the
area of contribution;
(6) "Aquifer" means a geologic formation, group of formations or part of a formation that contains sufficient saturated, permeable materials to yield significant quantities
of water to wells and springs;
(7) "Affected water company" means any public or private water company owning
or operating a public water supply well within an aquifer protection area;
(8) "Stratified drift" means a predominantly sorted sediment laid down by or in
meltwater from glaciers and includes sand, gravel, silt and clay arranged in layers;
(9) "Municipality" means any town, consolidated town and city, consolidated town
and borough, city or borough;
(10) "Aquifer protection area" means any area consisting of well fields, areas of
contribution and recharge areas, identified on maps approved by the Commissioner of
Environmental Protection pursuant to sections 22a-354b to 22a-354d, inclusive, within
which land uses or activities shall be required to comply with regulations adopted pursuant to section 22a-354o by the municipality where the aquifer protection area is located; and
(11) "Best management practice" means a practice, procedure or facility designed
to prevent, minimize or control spills, leaks or other releases that pose a threat to groundwater.
(P.A. 89-305, S. 2, 32; P.A. 90-275, S. 1, 9; P.A. 95-218, S. 5.)
History: P.A. 90-275 redefined "regulated activity" to include a condition which may pose a threat to groundwater and
specified that the threatened groundwater must be in an aquifer protection area; P.A. 95-218 redefined "area of contribution"
to include other potentiometric surfaces in the location of such areas.
Sec. 22a-354i. Regulations. (a) On or before July 1, 1991, the Commissioner of
Environmental Protection shall publish notice of intent to adopt regulations in accordance with chapter 54 for land use controls in aquifer protection areas. The regulations
shall establish (1) best management practice standards for existing regulated activities
located entirely or in part within aquifer protection areas and a schedule for compliance
of nonconforming regulated activities with such standards, (2) best management practice
standards for and prohibitions of regulated activities proposed to be located entirely or
in part within aquifer protection areas, (3) procedures for exempting regulated activities
in aquifer protection areas upon determination solely by the commissioner that such
regulated activities do not pose a threat to any existing or potential drinking water supply
and (4) requirements for design and installation of groundwater monitoring within aquifer protection areas. In addition, the commissioner may adopt such other regulations as
deemed necessary to carry out the purposes of sections 22a-354b, 22a-354c, 22a-354h,
this section, sections 22a-354m, 22a-354n, subsection (e) of section 22a-354p and subsection (d) of section 22a-451, including but not limited to regulations which provide
for the manner in which the boundaries of aquifer protection areas shall be established
and amended; criteria and procedures for submission and review of applications to construct or begin regulated activities; procedures for granting, denying, limiting, revoking,
suspending, transferring and modifying permits for regulated activities; controls regarding the expansion of nonconforming regulated activities, including procedures for offsetting impacts from the expansion or modification of nonconforming regulated activities or procedures for modifying permits of regulated activities by the removal of other
potential pollution sources within the subject well field, procedures for the granting of
permits for such expansion or modification based on the certification of a qualified
person that such expansion meets criteria established by the commissioner; registration
requirements for existing regulated activities and procedures for transferring registrations; procedures for landowners to notify a municipality or the commissioner of a
change in use and other provisions for administration of the aquifer protection program.
(b) In adopting such regulations, the commissioner shall consider the guidelines
for aquifer protection areas recommended in the report prepared pursuant to special act
87-63, as amended, and shall avoid duplication and inconsistency with other state or
federal laws and regulations affecting aquifers. The regulations shall be developed in
consultation with an advisory committee appointed by the commissioner. The advisory
committee shall include the Commissioners of Public Works and Public Health and the
chairperson of the Public Utilities Control Authority, or their designees, members of
the public, and representatives of businesses affected by the regulations, agriculture,
environmental groups, municipal officers and water companies.
(P.A. 89-305, S. 3, 32; P.A. 90-275, S. 2, 9; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58; P.A. 98-209, S. 9.)
History: P.A. 90-275 amended Subsec. (a) to require publication of the notice of intent on or before July 1, 1991,
and authorized the commissioner to adopt other regulations; P.A. 93-381 replaced commissioner of health services with
commissioner of public health and addiction services, effective July 1, 1993; P.A. 95-257 replaced Commissioner and
Department of Public Health and Addiction Services with Commissioner and Department of Public Health, effective July
1, 1995; P.A. 98-209 amended Subsec. (a) to authorize provision in regulations for procedures for offsetting nonconforming
regulated activities.
Sec. 22a-354j. Consistency of aquifer regulations with regulations re farm resources management plans. State regulations for aquifer protection areas adopted by
the Commissioner of Environmental Protection pursuant to section 22a-354i shall be
consistent with regulations adopted by said commissioner for farm resources management plans pursuant to section 22a-354m.
(P.A. 89-305, S. 31, 32.)
Sec. 22a-354k. Groundwater education program. The Commissioner of Environmental Protection shall develop and implement a groundwater education program.
In developing such program the commissioner shall consult with the Commissioner
of Public Health, water utilities, state educational and research institutions, nonprofit
environmental organizations and any other person or agency the commissioner deems
necessary. The Cooperative Extension Service at The University of Connecticut shall
assist the commissioner in implementation of the program.
(P.A. 89-305, S. 4, 32; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58.)
History: P.A. 93-381 replaced commissioner of health services with commissioner of public health and addiction
services, effective July 1, 1993; P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction
Services with Commissioner and Department of Public Health, effective July 1, 1995.
Sec. 22a-354l. Model municipal aquifer protection ordinance. Not later than
October 1, 1995, the Commissioner of Environmental Protection shall prepare a model
municipal aquifer protection ordinance, consistent with regulations adopted under section 22a-354i. The ordinance may be considered by municipal aquifer protection agencies in adopting regulations pursuant to section 22a-354p.
(P.A. 89-305, S. 5, 32; P.A. 93-337, S. 1.)
History: P.A. 93-337 added a deadline of October 1, 1995, for adoption of a model ordinance.
Sec. 22a-354m. Farm resources management plans. (a) The Commissioner of
Environmental Protection may, in accordance with regulations adopted pursuant to subsection (d) of this section, require any person engaged in agriculture on land located
within an aquifer protection area and whose annual gross sales from agricultural products
during the preceding calendar year were two thousand five hundred dollars or more to
submit a farm resources management plan.
(b) The soil and water conservation district where the aquifer protection area is
located shall establish and coordinate a technical team to develop each plan. Such team
shall include a representative of the municipality in which the land is located and a
representative of any affected water company upon request of such municipality or
water company. For the purposes of developing the plan required pursuant to this section,
if a farm is located in two or more soil and water conservation districts, the district in
which the greater part of such farm is located shall be deemed to be the district in
which the entire farm is located. In developing a plan, a district shall consult with the
Commissioners of Environmental Protection and Agriculture, the College of Agriculture and Natural Resources at The University of Connecticut, the Connecticut Agricultural Experiment Station, the Soil Conservation Service, the state Agricultural and Conservation Committee and any other person or agency the district deems appropriate.
(c) The plan shall include a schedule for implementation and shall be periodically
updated as required by the commissioner. In developing a schedule for implementation,
the technical team shall consider technical and economic factors including, but not
limited to, the availability of state and federal funds. Any person engaged in agriculture
in substantial compliance with a plan approved under this section shall be exempt from
regulations adopted under section 22a-354o by a municipality in which the land is located. No plan shall be required to be submitted to the commissioner before July 1,
1992, or six months after completion of level B mapping where the farm is located,
whichever is later.
(d) On or before July 1, 1999, the Commissioner of Environmental Protection, in
consultation with the Commissioner of Agriculture, the United States Soil Conservation
Service, the Cooperative Extension Service at The University of Connecticut and the
Council for Soil and Water Conservation, shall publish notice of intent to adopt regulations in accordance with chapter 54 for farm resources management plans. Such regulations shall include, but not be limited to, a priority system and procedures for determining
if a farm management plan is required and the priority that is assigned to the preparation
of such a plan, best management practices, restrictions and prohibitions for manure
management, storage and handling of pesticides, reduced use of pesticides through pest
management practices, integrated pest management, fertilizer management and underground and above-ground storage tanks and criteria and procedures for submission and
review of farm resources management plans and amendments of such plans. In adopting
such best management practices, restrictions and prohibitions, the commissioner shall
consider existing state and federal guidelines or regulations affecting aquifers and agricultural resources management.
(P.A. 89-305, S. 6, 32; P.A. 90-275, S. 3, 9; P.A. 98-209, S. 10; June 30 Sp. Sess. P.A. 03-6, S. 146(e); P.A. 04-189,
S. 1.)
History: P.A. 90-275 increased the annual gross sales requirement from one thousand to two thousand five hundred
dollars, provided if a farm is located in two or more districts that the district in which the greater part of the farm is located
shall be deemed to be the district in which the entire farm is located, extended the earliest time in which a plan is required
to July 1, 1992, provided that the commissioner shall publish notice of intent to adopt regulations concerning farm resources
management plans on or before July 1, 1991, and required the regulations to include best management practices, restrictions
and prohibitions for designated items; P.A. 98-209 amended Subsec. (a) to make submittal of farm resources management
plans discretionary on the part of the commissioner, and amended Subsec. (d) to extend the date for notice of intent to
adopt regulations under this section and to authorize certain priorities within such regulations; June 30 Sp. Sess. P.A. 03-6 replaced Commissioner of Agriculture with Commissioner of Agriculture and Consumer Protection, effective July 1,
2004; P.A. 04-189 repealed Sec. 146 of June 30 Sp. Sess. P.A. 03-6, thereby reversing the merger of the Departments of
Agriculture and Consumer Protection, effective June 1, 2004.
See Sec. 22-6c re reimbursement by commissioner for costs of comprehensive farm nutrient management plan or farm
resources management plan.
Sec. 22a-354n. Delineation of aquifer protection areas on maps prepared by
zoning commissions, planning commissions or planning and zoning commissions.
Challenges to boundaries. The zoning commission, planning commission or planning
and zoning commission of each municipality with an aquifer protection area shall, in
accordance with regulations adopted by the commissioner pursuant to section 22a-354i,
delineate on any map showing zoning districts prepared in accordance with chapter 124
or 126 or any special act the boundaries of aquifer protection areas, including areas of
contribution and recharge areas as shown on level A maps approved or done by the
commissioner pursuant to section 22a-354c or any other provision of the general statutes.
An aquifer protection commission shall not delineate or alter the boundary of an aquifer
protection area except in accordance with regulations adopted by the commissioner. No
person may challenge the boundaries of the aquifer protection area at the local level
unless such challenge is based solely on a failure by the aquifer protection agency to
properly delineate the boundaries in accordance with regulations of the commissioner.
Any other challenge to established aquifer protection area boundaries shall be in the
form of a petition to the commissioner to amend the boundaries, in accordance with
regulations adopted by him.
(P.A. 89-305, S. 7, 32; P.A. 90-275, S. 4, 9.)
History: P.A. 90-275 provided that the delineation of the boundaries of aquifer protection areas be in accordance with
regulations, provided that the only ground for challenging the boundaries of the aquifer protection area be that the agency
failed to delineate such in accordance with regulations and specified that any other challenge to established boundaries
shall be a petition to amend the boundaries.