Section 1. Section 4b-91 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(a) Every contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building for work by the state, which is estimated to cost more than five hundred thousand dollars, except (1) a contract awarded by the Commissioner of Public Works for (A) a community court project, as defined in subsection (j) of section 4b-55, (B) the Connecticut Juvenile Training School project, as defined in subsection (k) of section 4b-55, (C) the downtown Hartford higher education center project, as defined in subsection (l) of section 4b-55, (D) The University of Connecticut library project, as defined in subsection (d) of section 4b-55, (E) a correctional facility project, as defined in subsection (m) of section 4b-55, (F) a juvenile detention center project, as defined in subsection (n) of section 4b-55, or (G) a student residential facility for the Connecticut State University system that is a priority higher education facility project, as defined in subsection (f) of section 4b-55, or (2) a project, as defined in subdivision (16) of section 10a-109c, undertaken and controlled by The University of Connecticut in accordance with section 10a-109n, shall be awarded to the lowest responsible and qualified general bidder who is prequalified pursuant to section 3 of this act on the basis of competitive bids in accordance with the procedures set forth in this chapter and section 9 of this act, after the Commissioner of Public Works or, in the case of a contract for the construction of or work on a building under the supervision and control of the Joint Committee on Legislative Management of the General Assembly, the joint committee or, in the case of a contract for the construction of or work on a building under the supervision and control of one of the constituent units of the state system of higher education, the constituent unit, has invited such bids by advertisements inserted at least once in one or more newspapers having a circulation in each county in the state. The Commissioner of Public Works, the joint committee or the constituent unit, as the case may be, shall indicate the prequalification classification and aggregate work capacity rating required for the contract in such advertisement. As used in this section, "prequalification classification" means the prequalification classifications established by the Commissioner of Administrative Services pursuant to section 3 of this act and "aggregate work capacity rating" means the aggregate work capacity ratings established by the Commissioner of Administrative Services pursuant to section 3 of this act.

(b) The Commissioner of Public Works, the joint committee or the constituent unit, as the case may be, shall determine the manner of submission and the conditions and requirements of such bids, and the time within which the bids shall be submitted, consistent with the provisions of sections 4b-91 to 4b-96, inclusive. Such award shall be made within sixty days after the opening of such bids. If the general bidder selected as the general contractor fails to perform the general contractor's agreement to execute a contract in accordance with the terms of the general contractor's general bid and furnish a performance bond and also a labor and materials or payment bond to the amount specified in the general bid form, an award shall be made to the next lowest responsible and qualified general bidder. [If] No employee of the Department of Public Works, the joint committee or a constituent unit with decision-making authority concerning the award of a contract may communicate with any bidder prior to the award of the contract if the communication results in the bidder receiving information about the contract that is not available to other bidders, except that if the lowest responsible and qualified bidder's price submitted is in excess of funds available to make an award, the Commissioner of Public Works, the Joint Committee on Legislative Management or the constituent unit, as the case may be, [is empowered to] may negotiate with such bidder and award the contract on the basis of the funds available, without change in the contract specifications, plans and other requirements. If the award of a contract on said basis is refused by such bidder, the Commissioner of Public Works, the Joint Committee on Legislative Management or the constituent unit, as the case may be, may negotiate with other contractors who submitted bids in ascending order of bid prices without change in the contract, specifications, plans and other requirements. In the event of negotiation with general bidders as provided [herein] in this section, the general bidder involved may negotiate with subcontractors on the same basis, provided such general bidder shall negotiate only with subcontractors named on such general bidder's general bid form.

(c) On and after October 1, 2004, no person may bid on a contract, except for a project described in subdivision (2) of subsection (a) of this section, for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building for work by the state or a municipality, which is estimated to cost more than five hundred thousand dollars and is paid for, in whole or in part, with state funds, unless the person is prequalified in accordance with section 3 of this act.

(d) On and after October 1, 2004, each bid submitted for a contract described in subsection (c) of this section shall include a copy of a prequalification statement issued by the Commissioner of Administrative Services showing that the bidder has the prequalification classification and aggregate work capacity ratings required under such contract. The bid shall also be accompanied by an update statement in such form as the Commissioner of Administrative Services prescribes. The form for such update statement shall provide space for information regarding all projects completed by the bidder since the date the bidder's prequalification certificate was issued or renewed, all projects the bidder currently has under contract, including the percentage of work on such projects not completed, the names and qualifications of the personnel who will have supervisory responsibility for the performance of the contract, any significant changes in the bidder's financial position or business organization since the date the certificate was issued or renewed, and such other relevant information as the Commissioner of Administrative Services prescribes. Any bid submitted without a copy of the prequalification certificate and an update statement shall be invalid.

(e) Any person who bids on a contract described in subsection (c) of this section shall certify under penalty of false statement at the conclusion of the bidding process that the information in the bid is true, that there has been no substantial change in the bidder's financial position or corporate structure since the bidder's most recent prequalification certificate was issued or renewed, other than those changes noted in the update statement, and that the bid was made without fraud or collusion with any person.

(f) Any person who receives information from a public official that is not available to the general public concerning any construction, reconstruction, alteration, remodeling, repair or demolition project on a public building prior to the date that an advertisement for bids on the project is published shall be disqualified from bidding on the project.

[(b)] (g) Notwithstanding the provisions of this chapter regarding competitive bidding procedures, the commissioner may select and interview at least three responsible and qualified general contractors [, and] who are prequalified pursuant to section 3 of this act and selected by the award panel established in section 9 of this act. The commissioner may negotiate with any one of such contractors a contract which is both fair and reasonable to the state for a community court project, as defined in subsection (j) of section 4b-55, the downtown Hartford higher education center project, as defined in subsection (l) of section 4b-55, The University of Connecticut library project, as defined in subsection (d) of section 4b-55, the Connecticut Juvenile Training School project, as defined in subsection (k) of section 4b-55, a correctional facility project, as defined in subsection (m) of section 4b-55, a juvenile detention center project, as defined in subsection (n) of section 4b-55, or a student residential facility for the Connecticut State University system that is a priority higher education facility project, as defined in subsection (f) of section 4b-55. Any general contractor awarded a contract pursuant to this subsection shall be subject to the same requirements concerning the furnishing of bonds as a contractor awarded a contract pursuant to subsection [(a)] (b) of this section. On and after October 1, 2004, any agency that seeks to have a project awarded without being subject to competitive bidding procedures shall certify to the joint committee of the General Assembly having cognizance of matters relating to legislative management that the project is of such an emergency nature that an exception to competitive bidding procedures is required. Such certification shall include input from all affected agencies, detail the need for the exception and include any relevant documentation.

Sec. 2. Section 4b-92 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

As used in this chapter and except as otherwise provided, the words "lowest responsible and qualified bidder" shall mean the bidder who is prequalified pursuant to section 3 of this act, and whose bid is the lowest of those bidders possessing the skill, ability and integrity necessary to faithful performance of the work based on objective criteria considering past performance and [financial responsibility] information contained in the update statement submitted pursuant to section 4b-91, as amended by this act. Essential information in regard to such qualifications shall be submitted with the bid in such form as the awarding authority may require by specification in the bid documents and on the bid form. Every general bid shall be accompanied by a bid bond or a certified check in an amount which shall be ten per cent of the bid, provided no such bid bond or certified check shall be required in relation to any general bid in which the total estimated cost of labor and materials under the contract with respect to which such general bid is submitted is less than fifty thousand dollars. Failure to execute a contract awarded as specified and bid shall result in the forfeiture of such bid bond or certified check. In considering past performance the awarding authority shall evaluate the skill, ability and integrity of bidders in terms of the bidders' fulfillment of contract obligations and of the bidders' experience or lack of experience with projects of the [size] nature and scope of the project for which the bids are submitted.

Sec. 3. (NEW) (Effective July 1, 2004) (a) As used in this section: (1) "Prequalification" means prequalification issued by the Commissioner of Administrative Services to bid on a contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building for work by the state or a municipality; (2) "subcontractor" means any person who performs any of the four classes of work specified in subsection (a) of section 4b-93 of the general statutes with a value in excess of twenty-five thousand dollars; and (3) "principals and key personnel" includes officers, directors, shareholders, members, partners and managerial employees.

(b) (1) Any person may apply for prequalification to the Department of Administrative Services. Such application shall be made on such form as the Commissioner of Administrative Services prescribes and shall be accompanied by a nonrefundable application fee as set forth in subdivision (2) of this subsection. The application shall be signed under penalty of false statement.

(2) The application fee shall be as follows:

 

Aggregate Work Capacity Rating

Fee

 

$ 5,000,000. 00 or less

$ 600. 00

 

$ 5,000,000. 01 - $ 8,000,000. 00

$ 750. 00

 

$ 8,000,000. 01 - $ 10,000,000. 00

$ 850. 00

 

$ 10,000,000. 01 - $ 15,000,000. 00

$ 1,000. 00

 

$ 15,000,000. 01 - $ 20,000,000. 00

$ 1,500. 00

 

$ 20,000,000. 01 - $ 40,000,000. 00

$ 2,000. 00

 

$ 40,000,000. 01 or more

$ 2,500. 00

(c) The application form shall, at a minimum, require the applicant to supply information concerning:

(1) The applicant's form of organization;

(2) The applicant's principals and key personnel and any names under which the applicant, principals or key personnel conducted business during the past five years;

(3) The applicant's experience on public and private construction projects over the past five years, or on the applicant's ten most recently-completed projects and the names of any subcontractors used on the projects;

(4) Any legal or administrative proceedings pending or concluded adversely against the applicant or any of the applicant's principals or key personnel within the past five years which relate to the procurement or performance of any public or private construction contract and whether the applicant is aware of any investigation pending against the applicant or any principal or key personnel;

(5) The nature of any financial, personal or familial relationship between the applicant and any public or private construction project owner listed on the application as constituting construction experience;

(6) A statement of whether (A) the applicant has been disqualified pursuant to section 4b-95 of the general statutes, this section or section 31-57c or 31-57d of the general statutes, (B) the applicant is on the list distributed by the Labor Commissioner pursuant to section 31-57a of the general statutes, (C) the applicant is disqualified or prohibited from being awarded a contract pursuant to section 31-57b of the general statutes, (D) the applicant has been disqualified by another state, (E) the applicant has been disqualified by a federal agency or pursuant to federal law, (F) the applicant's registration has been suspended or revoked by the Department of Consumer Protection pursuant to section 20-341gg of the general statutes, as amended by this act, (G) the applicant has been disqualified by a municipality, and (H) the matters that gave rise to any such disqualification, suspension or revocation have been eliminated or remedied; and

(7) Other information as the commissioner deems relevant to the determination of the applicant's qualifications and responsibilities.

(d) The applicant shall include a statement of financial condition prepared by a certified public accountant which includes information concerning the applicant's assets and liabilities, plant and equipment, bank and credit references, bonding company and maximum bonding capacity, and other information as the commissioner deems relevant to an evaluation of the applicant's financial capacity and responsibility.

(e) Information contained in the application shall be current as of the time of filing except that the statement of financial condition shall pertain to the applicant's most recently-completed fiscal year.

(f) The commissioner shall determine whether to prequalify an applicant on the basis of the application and on relevant past performance according to procedures and criteria set forth in regulations which the commissioner shall adopt, in accordance with chapter 54 of the general statutes. Such criteria shall include, at a minimum, the record of the applicant's performance, including, but not limited to, written evaluations of the applicant's performance on public or private projects within the past five years, the applicant's past experience on projects of various size and type, the skill, ability and integrity of the applicant and any subcontractors used by the applicant, the experience and qualifications of supervisory personnel employed by the applicant, the maximum amount of work the applicant is capable of undertaking as demonstrated by the applicant's financial condition, bonding capacity, size of past projects and present and anticipated work commitments, and any other relevant criteria that the commissioner prescribes. Such regulations shall also (1) provide that the criteria considered shall be assigned separate designated numerical values and weights and that the applicant shall be assigned an overall numerical rating on the basis of all criteria, and (2) establish prequalification classifications and aggregate work capacity ratings. Such prequalification classifications shall be used to establish the types of work a contractor is qualified to perform and the aggregate work capacity ratings shall be used to establish the maximum amount of work a contractor is capable of undertaking.

(g) (1) The applicant shall indicate the prequalification classifications and aggregate work capacity rating that are sought. The commissioner may issue a certificate of prequalification to any applicant who meets the requirements of this section. Such certificate shall be effective for one year from the date issued and shall indicate the contractor's prequalification classifications and aggregate work capacity ratings.

(2) A prequalified contractor may apply at any time for additional prequalification classifications or aggregate work capacity ratings by submitting the applicable increase in fee, a completed update statement, and other information the commissioner requires.

(3) The commissioner may renew a prequalification certificate upon receipt of a completed update statement, any other material the commissioner requires and a nonrefundable fee in an amount equal to one-half of the application fee for the applicable aggregate work capacity rating as set forth in subsection (b) of this section, except that in no event shall such fee be less than six hundred dollars.

(h) Not later than sixty days after receiving a completed application, the commissioner shall mail a notice to the applicant concerning the commissioner's preliminary determination regarding the conditions of the prequalification certification, a denial of certification, a reduction in the level of certification sought or nonrenewal of certification. Any applicant aggrieved by the commissioner's preliminary determination may request copies of the information upon which the commissioner relied in making the preliminary determination, provided such request is made not later than ten days after the date the notice was mailed as indicated by the postmark on the envelope. Not later than twenty days after said postmark date the applicant may submit additional information to the commissioner with a request for reconsideration. The commissioner shall issue a final determination regarding the application not later than ninety days after the date the commissioner mailed the notice of the preliminary determination, which ninety-day period may be extended for an additional period not to exceed ninety days if (1) the commissioner gives written notice to the applicant that the commissioner requires additional time, and (2) such notice is mailed during the initial ninety-day period.

(i) The commissioner may not issue a prequalification certificate to any contractor (1) who is disqualified pursuant to section 31-57c or 31-57d of the general statutes, or (2) who has a principal or key personnel who, within the past five years, has a conviction or has entered a plea of guilty or nolo contendere for or has admitted to commission of an act or omission that reasonably could have resulted in disqualification pursuant to any provision of subdivisions (1) to (3), inclusive, of subsection (d) of section 31-57c of the general statutes or subdivisions (1) to (3), inclusive, of subsection (d) of section 31-57d of the general statutes, as determined by the commissioner.

(j) The commissioner may revoke a contractor's prequalification or reduce the contractor's prequalification classification or aggregate work capacity ratings, after an opportunity for a hearing, if the commissioner receives additional information that supports such revocation or reduction.

(k) (1) Any materially false statement in the application or any update statement may, in the discretion of the awarding authority, result in termination of any contract awarded the applicant by the awarding authority. The awarding authority shall provide written notice to the commissioner of such false statement not later than thirty days after discovering such false statement. The commissioner shall provide written notice of such false statement to the Commissioner of Public Works and the Commissioner of Consumer Protection not later than thirty days after discovering such false statement or receiving such notice.

(2) The commissioner shall revoke the prequalification of any person, after an opportunity for hearing, if the commissioner finds that the person has included any materially false statement in such application or update statement, has been convicted of a crime related to the procurement or performance of any public or private construction contract or within the past five years or has otherwise engaged in fraud in obtaining or maintaining prequalification. Any person whose prequalification has been revoked pursuant to this subsection shall be disqualified for a period of two years after which the person may reapply for prequalification, except that a person whose prequalification has been revoked on the basis of conviction of a crime or engaging in fraud shall be disqualified for a period of five years after which the person may reapply for prequalification. The commissioner shall not prequalify a person whose prequalification has been revoked pursuant to this subdivision until the expiration of said two or five-year disqualification period and the commissioner is satisfied that the matters that gave rise to the revocation have been eliminated or remedied.

(l) The commissioner shall provide written notice of any revocation, disqualification, reduction in classification or capacity rating or reinstated prequalification to the Commissioner of Public Works and the Commissioner of Consumer Protection not later than thirty days after any final determination.

(m) The provisions of this section and section 4 of this act shall not apply to subcontractors.

(n) The commissioner shall establish an update statement for use by bidders for purposes of renewing or upgrading a prequalification certificate and for purposes of submitting a bid pursuant to section 4b-91 of the general statutes, as amended by this act.

(o) Any applicant aggrieved by the commissioner's final determination concerning a preliminary determination, a denial of certification, a reduction in prequalification classification or aggregate work capacity rating or a revocation or nonrenewal of certification may appeal to the Superior Court in accordance with section 4-183 of the general statutes.

Sec. 4. (NEW) (Effective October 1, 2004) (a) The Commissioner of Administrative Services shall adopt regulations, in accordance with chapter 54 of the general statutes, to establish a standard contractor evaluation form. Such form shall include, at a minimum, the following evaluation criteria: (1) Timeliness of performance; (2) quality of performance; (3) cost containment, including, but not limited to, the contractor's ability to work within the contract's allotted cost, the accuracy of the contractor's billing, and the number and cause of change orders and the manner in which the contractor determined the price on the change orders; (4) safety; (5) the quality of the contractor's working relationship with the agency and the quality of the contractor's supervision of the work area; (6) communication with the agency; (7) the quality of the contractor's required documentation; (8) the performance of the contractor's subcontractors, to the extent known by the official who completes the evaluation; and (9) the contractor's and any subcontractor's compliance with part III of chapter 557 of the general statutes, or chapter 558 of the general statutes, or the provisions of the federal Davis-Bacon Act, 40 USC, Sections 276a to 276a-5, inclusive, as from time to time amended, to the extent known by the official who completes the evaluation.

(b) Each public agency shall complete and submit the evaluation form to the commissioner after completion of a building project under the agency's control if the building project is funded, in whole or in part, by state funds. The commissioner shall include the evaluation in the contractor's prequalification file. The official shall mail a copy of the completed evaluation form to the contractor. Any contractor who wishes to contest any information contained in the evaluation form may submit a written response to the commissioner not later than thirty days after the date the form was mailed as indicated by the postmark on the envelope. Such response shall set forth any additional information concerning the building project or the oversight of the contract by the public agency that may be relevant in the evaluation of the contractor's performance on the project. The commissioner shall include any such response in the contractor's prequalification file.

(c) As used in this section, "public agency" means a public agency, as defined in section 1-200 of the general statutes, but does not include The University of Connecticut with respect to any project, as defined in subdivision (16) of section 10a-109c of the general statutes, that is undertaken and controlled by the university, and "subcontractor" means any person who performs any of the four classes of work specified in subsection (a) of section 4b-93 of the general statutes with a value in excess of twenty-five thousand dollars.

(d) Upon fifty per cent completion of any building project under a public agency's control, the agency shall advise the contractor in writing of the agency's preliminary evaluation of the contractor's performance on the project.

Sec. 5. Subsection (m) of section 1-84 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(m) No public official or state employee shall knowingly accept, directly or indirectly, any gift, as defined in subsection (e) of section 1-79, from any person the official or employee knows or has reason to know: (1) Is doing business with or seeking to do business with the department or agency in which the official or employee is employed; [or] (2) is engaged in activities which are directly regulated by such department or agency; or (3) is prequalified under section 3 of this act. No person shall knowingly give, directly or indirectly, any gift or gifts in violation of this provision.

Sec. 6. (NEW) (Effective January 1, 2004) (a) Not later than January 1, 2004, and annually thereafter, each awarding authority shall prepare a report on the status of (1) any ongoing project for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building which is estimated to cost more than five hundred thousand dollars and is paid for, in whole or in part, with state funds, or (2) any property management contract awarded by the Department of Public Works which has an annual value of one hundred thousand dollars or more. The awarding authority shall submit the report to the Governor and the joint standing committees of the General Assembly having cognizance of matters relating to government administration and finance, revenue and bonding. The report shall be submitted in accordance with section 11-4a of the general statutes. The first report submitted after a contract is awarded shall indicate: (A) When, where and how the request for bids was advertised; (B) who bid on the projects; (C) the provisions of law that governed the award of the contract and if there were any deviations from standard procedure in awarding the contract; (D) the names of the individuals who had decision-making authority in awarding the contract, including, but not limited to, the individuals who served on any award panel; (E) if an award panel was used, whether the recommendation of the panel was followed and, if applicable, the reason why such recommendation was not followed; (F) whether the awarding authority has any other contracts with the contractor who was awarded the contract, and if so, the nature and value of the contract; and (G) any provisions of law that authorized or funded the project.

(b) The University of Connecticut shall not be required to submit a report pursuant to this section for any project, as defined in subdivision (16) of section 10a-109c of the general statutes, that is undertaken and controlled by the university.

Sec. 7. Section 4b-100 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(a) The Commissioner of Public Works shall adopt regulations, in accordance with chapter 54, to implement the provisions of sections 4b-91 to 4b-100, inclusive, as amended by this act. Such regulations shall include (1) objective criteria for evaluating the qualifications of bidders, and (2) the procedures for evaluating bids after the prequalification status of the bidder has been verified.

(b) The Commissioner of Public Works shall adopt regulations, in accordance with the provisions of chapter 54, establishing a procedure for promptly hearing and ruling on claims alleging a violation or violations of sections 4b-91 to 4b-100, inclusive, as amended by this act. Such claims may be initiated by the Department of Public Works or any party whose financial interests may be affected by the decision on such a claim.

Sec. 8. (NEW) (Effective October 1, 2004) (a) The Department of Public Works shall establish Construction Services Award Panels which shall each consist of six members: Three of whom shall be appointed by the Commissioner of Public Works and shall be current employees of the Department of Public Works; two of whom shall be appointed by the department head of the user agency; and one of whom who shall be a neutral party appointed by the commissioner. The members of each award panel appointed by the Commissioner of Public Works shall serve for terms of one year from July first. If any vacancy occurs on the panel, the Commissioner of Public Works or the head or acting head of the user agency, as appropriate, shall appoint a person for the unexpired term in accordance with the provisions of this subsection.

(b) A panel established pursuant to this section shall not be deemed to be a board or commission within the meaning of section 4-9a of the general statutes. Such panels shall be the award panels for any contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building for the state pursuant to sections 4b-91 to 4b-100, inclusive, of the general statutes, as amended by this act, and section 4b-24 of the general statutes, as amended by this act.

(c) For each applicable contract, the commissioner shall designate one panel to screen all submitted proposals and establish a list of bidders to be interviewed and shall designate a separate panel consisting of different members to interview bidders on the list and submit a list of recommended contractors to the commissioner.

(d) The commissioner shall designate one voting member on each panel to serve as chairperson. The chairperson shall moderate the committee, collect votes and compile the results.

(e) Each award panel shall prepare a memorandum on the selection process indicating how the evaluation criteria were applied to determine the most qualified firms, which shall be available to the public after execution of the contract with the selected contractor. The commissioner shall select a contractor from among the list of firms submitted by the award panel that interviewed the contractors. After the commissioner has made a selection, the names of the contractor firms submitted to the commissioner shall be available to the public upon request. The commissioner shall also prepare a memorandum on the final phase of the selection process, indicating how the commissioner applied the evaluation criteria to determine the most qualified firm. Such memorandum shall be available to the public after execution of the contract with the selected contractor.

(f) The commissioner shall adopt regulations, in accordance with chapter 54 of the general statutes, to implement the provisions of this section.

Sec. 9. Subdivision (4) of section 4b-24 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(4) The commissioner may designate projects to be accomplished on a total cost basis for (A) new facilities to provide for the substantial space needs of a requesting agency, (B) the installation of mechanical or electrical equipment systems in existing state facilities, or (C) the demolition of any state facility that the commissioner is authorized to demolish under the general statutes. If the commissioner designates a project as a designated total cost basis project, the commissioner may enter into a single contract with a private developer which may include such project elements as site acquisition, architectural design and construction. The commissioner shall select a private developer from among the developers who are selected and recommended by the award panels established in section 9 of this act. All contracts for such designated projects shall be based on competitive proposals received by the commissioner, who shall give notice of such project, and specifications for the project, by advertising, at least once, in a newspaper having a substantial circulation in the area in which such project is to be located. No contract which includes the construction, reconstruction, alteration, remodeling, repair or demolition of any public building for work by the state for which the total cost is estimated to be more than five hundred thousand dollars may be awarded to a person who is not prequalified for the work in accordance with section 3 of this act. The commissioner shall determine all other requirements and conditions for such proposals and awards and shall have sole responsibility for all other aspects of such contracts. Such contracts shall state clearly the responsibilities of the developer to deliver a completed and acceptable product on a date certain, the maximum cost of the project and, as a separate item, the cost of site acquisition, if applicable. No such contract may be entered into by the commissioner without the prior approval of the State Properties Review Board and unless funding has been authorized pursuant to the general statutes or a public or special act.

Sec. 10. Subsection (c) of section 4b-52 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2004):

(c) Whenever the Commissioner of Public Works declares that an emergency condition exists at any state facility, other than a building under the supervision and control of the Joint Committee on Legislative Management, and that the condition would adversely affect public safety or the proper conduct of essential state government operations, or said joint committee declares that such an emergency exists at a building under its supervision and control, the commissioner or the joint committee may employ such assistance as may be required to restore facilities under their control and management, or the commissioner may so act upon the request of a state agency, to restore facilities under the control and management of such agency, without inviting bids as required in subsection (b) of this section. The commissioner shall take no action requiring the expenditure of more than five hundred thousand dollars to restore any facility under this subsection (1) without the written consent of the Governor, and (2) until the commissioner has certified to the joint committee of the General Assembly having cognizance of matters relating to legislative management that the project is of such an emergency nature that an exception to subsection (b) of this section is required. Such certification shall include input from all affected agencies, detail the need for the exception and include any relevant documentation. The provisions of this subsection shall not apply if any person is obligated under the terms of an existing contract with the state to render such assistance. The annual report of the commissioner shall include a detailed statement of all expenditures made under this subsection.

Sec. 11. Subsections (b) to (e), inclusive, of section 4b-55 of the general statutes are repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(b) "Consultant" means (1) any architect, professional engineer, landscape architect, land surveyor, accountant, interior designer, environmental professional or construction administrator, who is registered or licensed to practice such person's profession in accordance with the applicable provisions of the general statutes, or (2) any planner [, construction manager] or financial specialist;

(c) "Consultant services" shall include those professional services rendered by architects, professional engineers, landscape architects, land surveyors, accountants, interior designers, environmental professionals, construction administrators, planners [, construction managers] or financial specialists, as well as incidental services that members of these professions and those in their employ are authorized to perform;

(d) "University of Connecticut library project" means a project to renovate and improve the Homer Babbidge Library at The University of Connecticut;

(e) "Firm" means any individual, partnership, corporation, joint venture, association or other legal entity (1) authorized by law to practice the profession of architecture, landscape architecture, engineering, land surveying, accounting, interior design, environmental or construction administration, or (2) practicing the profession of planning [, construction management] or financial specialization.

Sec. 12. (NEW) (Effective October 1, 2004) With respect to any contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building under the supervision and control of the Commissioner of Transportation which contract is estimated to cost more than five hundred thousand dollars and is not subject to section 4b-51 of the general statutes, the Commissioner of Transportation shall award the contract to the lowest responsible and qualified bidder, as defined in section 4b-92 of the general statutes, as amended by this act, in accordance with regulations which the commissioner shall adopt, in accordance with chapter 54 of the general statutes. Such regulations shall establish, at a minimum: (1) Standards for the advertisement of opportunities to bid, (2) objective criteria for evaluating the qualifications of bidders, (3) the procedures for evaluating bids after the prequalification status of a bidder has been verified, and (4) award panels for the purpose of screening submitted proposals, interviewing bidders and making recommendations to the commissioner. Any contract that is subject to section 4b-51 of the general statutes shall be awarded by the Commissioner of Public Works in accordance with chapter 60 of the general statutes.

Sec. 13. Subdivision (12) of section 13b-4 of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(12) To provide for the planning and construction of any capital improvements and the remodeling, alteration, repair or enlargement of any real asset that may be required for the development and operation of a safe, efficient system of highway, mass transit, marine and aviation transportation, provided (A) the acquisition, other than by condemnation, or the sale or lease, of any property that is used for such purposes shall be subject to the review and approval of the State Properties Review Board in accordance with the provisions of subsection (f) of section 4b-3, and (B) any contract for the planning, construction, remodeling, alteration, repair or enlargement of any public building which is estimated to cost more than five hundred thousand dollars shall be advertised and awarded in accordance with section 12 of this act.

Sec. 14. Section 13b-42 of the general statutes is amended by adding subsection (h) as follows (Effective October 1, 2004):

(NEW) (h) Any lease which involves the construction, reconstruction, alteration, remodeling, repair or demolition of any public building which is estimated to cost more than five hundred thousand dollars shall be advertised and awarded in accordance with section 12 of this act.

Sec. 15. Section 20-341gg of the general statutes is repealed and the following is substituted in lieu thereof (Effective October 1, 2004):

(a) As used in this section, "major contractor" means (1) any person engaged in the business of construction, structural repair, structural alteration, dismantling or demolition of a structure or addition that exceeds the threshold limits provided in section 29-276b, or (2) any person who, under the direction of a general contractor, performs or offers to perform any work that impacts upon the structural integrity of a structure or addition, including repair, alteration, dismantling or demolition of a structure or addition that exceeds the threshold limits provided in section 29-276b. Such work includes, but is not limited to, roofing, masonry and structural frame work.

(b) No person shall engage in or offer to perform the work of any major contractor in this state on any proposed structure or existing structure or addition that exceeds the threshold limits contained in section 29-276b unless such person has first obtained a license or certificate of registration as required under the provisions of chapter 539 or a registration from the Department of Consumer Protection in accordance with the provisions of this section. Individuals licensed under chapter 393 shall be exempt from the provisions of this chapter while engaging in work that they are licensed to perform. The department shall issue a certificate of registration to any person who is prequalified pursuant to section 3 of this act who applies for registration in accordance with this section. Such prequalified person shall not be required to pay a fee for such registration at any time that the person maintains valid prequalification. If the individual or the firm, company, partnership or corporation employing such individual is engaged in work on a structure or addition that exceeds the threshold limits contained in section 29-276b and requires licensure under chapter 393, the firm, company, partnership or corporation shall be exempt from the provisions of this chapter concerning registration of major contractors, if the firm, company, partnership or corporation employs an individual who is licensed as a contractor under chapter 393 to perform such work. The department shall furnish to each qualified applicant a registration certifying that the holder of such registration is entitled to engage in the work for which the person has been issued a registration under this subsection, and the holder of such registration shall carry it on his person while engaging in such work. Such registration shall be shown to any properly interested person upon request. No such registration shall be transferred to or used by any person other than the person to whom the registration was issued. The department shall maintain rosters of registrants and shall update such rosters annually. The department may provide copies of rosters to the public for an appropriate fee. The department may suspend or revoke any registration issued by the department if the holder of such registration is convicted of a felony, is grossly incompetent, is disqualified, pursuant to section 3 of this act or whose prequalification certificate has been revoked pursuant to section 3 of this act, engages in malpractice or unethical conduct or knowingly makes false, misleading or deceptive representations regarding his work or violates any regulation adopted under subsection (c) of this section. Before any registration is suspended or revoked, such holder shall be given notice and an opportunity for hearing as provided in regulations adopted under subsection (c) of this section. The Commissioner of Consumer Protection shall provide written notice of any suspension or revocation of a registration to the Commissioner of Administrative Services not later than ten days after such suspension or revocation.

(c) The Commissioner of Consumer Protection shall adopt regulations, in accordance with chapter 54, to implement the provisions of this section. Such regulations shall (1) establish the registration requirements for major contractors, (2) specify application and registration fees, and (3) establish occupational standards for the preservation of the public safety.

Approved July 9, 2003