Table of Contents
Sec. 22a-336. (Formerly Sec. 25-2). Cooperation with other agencies. Right of entry in
performance of duty.
Sec. 22a-337. (Formerly Sec. 25-3). Commissioner's powers.
Secs. 22a-338 and 22a-339. (Formerly Secs. 25-3b and 25-3c). Algae abatement and control
program. Reimbursement of towns and lake authorities for algae and aquatic weed control
programs.
Sec. 22a-339a. Grants to improve water quality of lakes used for public recreation.
Sec. 22a-339b. Criteria for grants. Public benefit.
Sec. 22a-339c. Grant conditions.
Sec. 22a-339d. Regulations.
Sec. 22a-339e. Municipal assessment for costs of lake management implementation measures.
Sec. 22a-339f. Pilot program for lake preservation.
Sec. 22a-340. (Formerly Sec. 25-3d). Channels for access to and from deep water to uplands.
Sec. 22a-341. (Formerly Sec. 25-4). Approval of agreements or compacts.
Sec. 22a-342. (Formerly Sec. 25-4a). Establishment of stream channel encroachment lines.
Permits for encroachments, required findings. Fees.
Sec. 22a-342a. Civil penalty.
Sec. 22a-343. (Formerly Sec. 25-4b). Determination of lines.
Sec. 22a-344. (Formerly Sec. 25-4c). Public hearing. Order establishing lines.
Sec. 22a-345. (Formerly Sec. 25-4d). Nonconforming uses. Taking of existing structures by
commissioner.
Sec. 22a-346. (Formerly Sec. 25-4e.) Encroachment as nuisance.
Sec. 22a-347. (Formerly Sec. 25-4f). Regulations and procedures.
Sec. 22a-348. (Formerly Sec. 25-4g). Municipal powers.
Sec. 22a-349. (Formerly Sec. 25-4h). Permitted agricultural use.
Sec. 22a-349a. General permits for minor activities. Regulations.
Sec. 22a-350. (Formerly Sec. 25-5). Study of conditions relating to flood control.
Sec. 22a-351. (Formerly Sec. 25-5a). Inventory of groundwater and surface water resources. Study of water policy needs.
Sec. 22a-352. (Formerly Sec. 25-5b). Long-range plan for management of water resources.
Sec. 22a-353. (Formerly Sec. 25-5c). Duties of Secretary of the Office of Policy and Management. Grants to regional planning agencies. Federal funds.
Sec. 22a-354. (Formerly Sec. 25-5d). Appropriation of bond proceeds.
Sec. 22a-354a. "Existing well fields" and "potential well fields", defined.
Sec. 22a-354b. Standards for modeling and mapping of locations of aquifers.
Sec. 22a-354c. Mapping of well fields by water companies.
Sec. 22a-354d. Completion of mapping of well fields.
Sec. 22a-354e. Inventory of land uses overlying aquifers.
Sec. 22a-354f. Guidelines for inventory.
Sec. 22a-354g. Findings.
Sec. 22a-354h. Definitions.
Sec. 22a-354i. Regulations.
Sec. 22a-354j. Consistency of aquifer regulations with regulations re farm resources management plans.
Sec. 22a-354k. Groundwater education program.
Sec. 22a-354l. Model municipal aquifer protection ordinance.
Sec. 22a-354m. Farm resources management plans.
Sec. 22a-354n. Delineation of aquifer protection areas on maps prepared by zoning commissions, planning commissions or planning and zoning commissions. Challenges to boundaries.
Sec. 22a-354o. Municipal regulation of aquifer protection areas.
Sec. 22a-354p. Adoption of regulations. Permits.
Sec. 22a-354q. Appeals.
Sec. 22a-354r. Findings on appeal. Setting aside or modifying action. Authority to purchase land.
Sec. 22a-354s. Penalty. Court orders.
Sec. 22a-354t. Revocation of municipal authority to regulate aquifer protection areas.
Sec. 22a-354u. Incentive program for public recognition of users of land within aquifer
protection areas who implement innovative approaches to groundwater protection.
Sec. 22a-354v. Technical training classes for members and staff of municipal aquifer protection agencies.
Sec. 22a-354w. Guidelines for acquisition of lands surrounding public water supply well
fields.
Sec. 22a-354x. Duties of the commissioner. Technical, coordinating and research services.
Supervision. Annual report.
Sec. 22a-354y. Preparation of municipal assistance program by water companies.
Sec. 22a-354z. Mapping by water companies of areas of contribution and recharge areas for
existing and potential stratified draft wells.
Sec. 22a-354aa. Strategic groundwater monitoring program in aquifer protection areas.
Sec. 22a-354bb. Inventory of agricultural land uses overlaying mapped well fields.
Sec. 22a-355. (Formerly Sec. 25-5e). Land sales by water companies. Commissioner's
duties.
Sec. 22a-356. (Formerly Sec. 25-5f). Cost estimates re groundwater recharge and discharge.
Sec. 22a-357. (Formerly Sec. 25-6). Special reports.
Sec. 22a-358. (Formerly Sec. 25-7a). Sale of water by public water systems.
Sec. 22a-359. (Formerly Sec. 25-7b). Regulation of dredging and erection of structures
and placement of fill in tidal, coastal or navigable waters. Sunken or grounded vessels.
Sec. 22a-360. (Formerly Sec. 25-7c). Establishment of boundaries.
Sec. 22a-361. (Formerly Sec. 25-7d). Permit for dredging or erection of structures,
placement of fill or mooring areas. Regulations. General permits. Removal of sand and
gravel. Fee.
Sec. 22a-361a. Civil penalty.
Sec. 22a-362. (Formerly Sec. 25-7e). Violations as public nuisance.
Sec. 22a-363. (Formerly Sec. 25-7f). Penalty for violation.
Sec. 22a-363a. Definitions.
Sec. 22a-363b. Activities eligible for certificate of permission. Exemptions. Issuance of
certificate. Failure of commissioner to respond.
Sec. 22a-363c. Application fee.
Sec. 22a-363d. Emergency authorization. Expiration.
Sec. 22a-363e. Failure to comply with order. Littoral owner as responsible party.
Sec. 22a-363f. Cease and desist orders. Hearing. Decision.
Sec. 22a-364. (Formerly Sec. 25-8). Stream gauging stations.
Sec. 22a-365. Short title: Connecticut Water Diversion Policy Act.
Sec. 22a-366. Legislative findings.
Sec. 22a-367. Definitions.
Sec. 22a-368. Registration of existing diversions. Permits. Transfer.
Sec. 22a-369. Application for permit. Information required.
Sec. 22a-370. Notice to town re application.
Sec. 22a-371. Request for additional information. Notice of completed application. Notice
of hearing. Waiver of hearing.
Sec. 22a-372. Commencement of hearing. Application and documents available for public inspection. Parties to proceedings. Regulations. Fees.
Sec. 22a-373. Decision.
Sec. 22a-374. Appeals.
Sec. 22a-375. Investigation, suspension or revocation of permits. Inventory of diversions.
Sec. 22a-376. Injunctions. Forfeiture. Penalties.
Sec. 22a-377. Exemptions. Regulations.
Sec. 22a-378. Water supply emergency. Violation of water supply emergency order.
Sec. 22a-378a. General permits for minor activities. Regulations.
Sec. 22a-379. Diversion permit. Fee.
Sec. 22a-380. Water resources policy.
Secs. 22a-381 and 22a-382.
Secs. 22a-383 to 22a-390. (Formerly Secs. 25-10 to 25-12, 25-14 to 25-18). Removal of
sand and gravel from lands under tidal and coastal waters.
Secs. 22a-391 to 22a-400.
GENERAL PROVISIONS
Sec. 22a-337. (Formerly Sec. 25-3). Commissioner's powers. (a) The Commissioner of Environmental Protection, in consultation with the Commissioner of Public
Health, is authorized, as the representative of the state of Connecticut, to negotiate,
cooperate and enter into agreements or compacts with authorized agencies representing
any one or more states or commonwealths, or the United States, or any combination
thereof, relative to flood control, river and harbor improvements or obstructions, navigation, pollution of interstate waters, diversion of interstate waters, and the use of such
interstate waters by any agency of the United States, or any one or more states or commonwealths, which will tend to increase the hazard of damage to persons or property
located or situated in this state by reason of flood waters or which will in any way
interfere adversely with the navigability of any stream or river located wholly or partially
within this state during periods of low flow in the main stream or any of its tributaries.
With respect to matters relating to river and harbor improvements and the navigability
of streams or rivers, the Commissioner of Environmental Protection shall request and
consider recommendations of the Commissioner of Transportation.
Secs. 22a-338 and 22a-339. (Formerly Secs. 25-3b and 25-3c). Algae abatement and control program. Reimbursement of towns and lake authorities for algae
and aquatic weed control programs. Sections 22a-338 and 22a-339 are repealed.
Sec. 22a-339a. Grants to improve water quality of lakes used for public recreation. The Commissioner of Environmental Protection may make a grant to any municipality or lake association for a project to improve the water quality of a lake used for
public recreation. As used in sections 22a-339a to 22a-339e, inclusive, (1) "project"
means any diagnostic feasibility study associated with eutrophication abatement, lake
management activities or watershed management or any implementation measure designed to improve or restore water quality and (2) "lake association" means a district
established by special act or pursuant to section 7-325, authorized to make appropriations, levy taxes and perform lake management functions.
Sec. 22a-339b. Criteria for grants. Public benefit. The Commissioner of Environmental Protection shall evaluate the eligibility of a project for a grant and shall award
such grant based on lake priorities established by said commissioner pursuant to the
federal Clean Water Act (33 USC 1251 et seq.) and the benefit to the public from the
project. Such benefit shall be determined by an assessment of (1) state-owned public
access, (2) the impact of the project on the water quality and aquatic resources of the
lake and (3) existing and proposed watershed management practices.
Sec. 22a-339c. Grant conditions. The grants made under section 22a-339b shall
be subject to the following conditions: (1) No grant shall be made for any study, report,
plan or restoration measure except if such study, report, plan or restoration measure is
in accordance with a priority system established by the Commissioner of Environmental
Protection in accordance with the provisions of the federal Clean Water Act (33 USC
1251 et seq.), (2) no grant shall be made until a municipality or lake association has
agreed to pay that part of the total cost that is in excess of the applicable state grant, and
(3) the grant to each municipality or lake association shall equal seventy-five per cent
of the cost of a diagnostic feasibility study and fifty per cent of the cost of implementation
measures. Notwithstanding the provisions of this section, (A) if federal funds are available in the amount of seventy per cent of the cost of a diagnostic study, the state grant
shall not exceed thirty per cent of the cost of the study and (B) if federal funds are
available in the amount of fifty per cent of the cost of implementation measures, the
state grant shall not exceed twenty-five per cent of the cost of the measures. The commissioner may require the recipient of a grant implementing restoration measures to establish watershed management practices to prevent the reoccurrence of a water quality
problem.
Sec. 22a-339d. Regulations. The Commissioner of Environmental Protection
shall adopt regulations in accordance with the provisions of chapter 54 to carry out the
purposes of sections 22a-339a to 22a-339c, inclusive. Such regulations shall include
provisions for reviewing the water quality of lakes to determine the eligibility for grants
made pursuant to section 22a-339a. The regulations shall be consistent with the provisions of the federal Clean Water Act (33 USC 1251 et seq.) and shall qualify the state
for the maximum amount of funds available under said act.
Sec. 22a-339e. Municipal assessment for costs of lake management implementation measures. A municipality may, by vote of its legislative body, impose an assessment of a proportion of the cost of lake management implementation measures upon
the owners of property specially benefited by such measures, provided no such assessment shall be in excess of the special benefit to the property. The balance of the cost of
the measure shall be paid from the general funds of the municipality. Any person aggrieved by an assessment may appeal in the manner provided for in section 7-250.
Sec. 22a-339f. Pilot program for lake preservation. The Commissioner of Environmental Protection shall:
Sec. 22a-340. (Formerly Sec. 25-3d). Channels for access to and from deep
water to uplands. The commissioner shall have the power and authority, after a public
hearing, subject to the issuance of a permit by the corps of engineers of the United States
army, to designate and lay out channels and boat basins in lands under tidal and coastal
waters for the purpose of providing access to and from deep water to uplands adjacent
to or bordering on tidal and coastal waters and for the improvement of coastal and inland
navigation by vessels, including small craft for recreational purposes with due regard
for the recreational, commercial and navigational needs of the state. The commissioner
shall promptly give written notice to the Commissioner of Transportation of any proceeding under this section, and shall consider such recommendations as the Commissioner of Transportation may submit to him within thirty days after the conclusion of
public hearings thereon. The Commissioner of Transportation is authorized to initiate
proceedings under this section.
Sec. 22a-341. (Formerly Sec. 25-4). Approval of agreements or compacts. No
agreement or compact provided for in subsection (a) of section 22a-337 shall be entered
into by said commissioner until it has been approved by the Governor and any such
agreement or compact shall contain a provision that the agreement or compact shall not
become effective until ratified by the General Assembly of this state.
Sec. 22a-342. (Formerly Sec. 25-4a). Establishment of stream channel encroachment lines. Permits for encroachments, required findings. Fees. The commissioner shall establish, along any tidal or inland waterway or flood-prone area considered
for stream clearance, channel improvement or any form of flood control or flood alleviation measure, lines beyond which, in the direction of the waterway or flood-prone area,
no obstruction, encroachment or hindrance shall be placed by any person, and no such
obstruction, encroachment or hindrance shall be maintained by any person unless authorized by said commissioner. The commissioner shall issue or deny permits upon applications for establishing such encroachments based upon his findings of the effect of such
proposed encroachments upon the flood-carrying and water storage capacity of the waterways and flood plains, flood heights, hazards to life and property, and the protection
and preservation of the natural resources and ecosystems of the state, including but not
limited to ground and surface water, animal, plant and aquatic life, nutrient exchange,
and energy flow, with due consideration given to the results of similar encroachments
constructed along the reach of waterway. Each application for a permit shall be accompanied by a fee as follows: (1) No change in grades and no construction of above-ground
structures, two hundred fifty dollars; (2) a change in grade and no construction of above-
ground structures, five hundred dollars; and (3) a change in grade and above-ground
structures or buildings, two thousand five hundred dollars. The commissioner may adopt
regulations, in accordance with the provisions of chapter 54, to prescribe the amount
of the fees required pursuant to this section. Upon the adoption of such regulations, the
fees required by this section shall be as prescribed in such regulations.
Sec. 22a-342a. Civil penalty. Any person who places any obstruction, encroachment or hindrance within any stream channel encroachment line established by the Commissioner of Environmental Protection pursuant to section 22a-342 without a permit
issued under said section, or is maintaining any such obstruction, encroachment or hindrance placed without such a permit, or in violation of the terms and conditions of such
permit shall be liable for a civil penalty of not more than one thousand dollars for each
offense. Each violation shall be a separate and distinct offense and in the case of a
continuing violation, each day's continuance thereof shall be deemed to be a separate
and distinct offense. The Commissioner of Environmental Protection may request the
Attorney General to bring a civil action in the superior court for the judicial district of
Hartford to seek imposition and recovery of such civil penalty.
Sec. 22a-343. (Formerly Sec. 25-4b). Determination of lines. The commissioner, in establishing such encroachment lines, shall base their location on the boundaries of the area which would be inundated by a flood similar in size to one or more
recorded floods which have caused extensive damages in such area or on a size of flood
computed by accepted methods applicable generally throughout the state or a region
thereof. The determination of the size of the flood and the boundaries of the inundated
area shall take into consideration the effects of probable future developments. The position of the lines may vary from the boundaries of the inundated area so as to minimize
the area of land to be regulated when a portion of the inundated area does not contribute
to the flood-carrying capacity of the waterway. The position of the lines shall, insofar
as practical, equitably affect riparian properties and interests depending upon existing
topography and shall be interdependent throughout the reaches of the waterway, and
shall conform with the requirements of the federal government imposed as conditions
for the construction of flood control projects. When the existing waterway, because of
natural or man-made constrictions, is such that such lines cannot be established by
standard engineering methods, a channel may be adopted, whereby the removal of such
constrictions may be anticipated so that reasonable lines can be established by methods
applicable to the state generally. When the flood boundary falls along the channel banks,
the lines shall be placed at the top of the bank.
Sec. 22a-344. (Formerly Sec. 25-4c). Public hearing. Order establishing lines.
The commissioner or a hearing examiner, designated by him, shall hold a public hearing
to review the proposed encroachment lines along any waterway or flood-prone area
prepared in accordance with section 22a-343 with due consideration of the equities
involved. Notice of such hearing shall be given by mail to all property owners known
to be affected by the proposed lines and shall be published three times in a newspaper
having a general circulation in the area involved. The commissioner shall take appropriate steps to inform the public and the interested property owners of the proposals by
making suitable maps available in the office of the town clerk of the town wherein
the property is located for inspection, study and discussion. After consideration of all
testimony and pertinent facts at his disposal and with due regard for the public interest
and the rights of respective property owners, the commissioner may approve the location
of the lines as proposed or as modified and thereupon shall establish such lines by order.
Such order shall be recorded with appropriate maps with the town clerks of the respective
towns involved. Notice of such order establishing or altering such line or lines shall be
mailed to all persons known to be affected thereby and shall be published three times
in a newspaper having a general circulation in the area involved. Any person aggrieved
by any order of the commissioner as to the location of such line may appeal therefrom,
in accordance with the provisions of section 4-183, except venue for such appeal shall
be in the judicial district of New Britain.
Sec. 22a-345. (Formerly Sec. 25-4d). Nonconforming uses. Taking of existing
structures by commissioner. When the establishment of such lines in accordance with
sections 22a-342 to 22a-348, inclusive, requires that they be placed through portions of
or so as to include entire existing structures within the regulated area, such structures
or portions thereof shall be considered as a nonconforming use of the area, except that,
if the structure is destroyed or damaged to the extent of more than fifty per cent of the
fair market value, such structure shall be replaced or repaired only through a permit
from the commissioner, provided the commissioner may define types of structures which
may be reconstructed within such lines without a permit. Whenever the commissioner
finds that existing structures or encroachments within the lines established constitute a
hazard to life and property in the event of flood, he is empowered to take such land and
structure as provided by chapter 835 and cause removal of such encroachment.
Sec. 22a-346. (Formerly Sec. 25-4e.) Encroachment as nuisance. After the commissioner has established such lines on any waterway or flood plain, any obstruction,
encroachment or hindrance of any nature placed within such lines in the direction of
the waterway, without specific authorization of the commissioner, shall be considered a
public nuisance. The Attorney General shall, at the request of the commissioner, institute
proceedings to enjoin and abate any such nuisance.
Sec. 22a-347. (Formerly Sec. 25-4f). Regulations and procedures. The commissioner may, subject to the provisions of subsection (a) of section 22a-6, adopt, revise
and amend such rules, regulations and procedures as are necessary to carry out the
purposes of sections 22a-342 to 22a-348, inclusive, in the public interest.
Sec. 22a-348. (Formerly Sec. 25-4g). Municipal powers. (a) The provisions of
sections 22a-342 to 22a-348, inclusive, shall not affect the provision of section 7-147
authorizing any town, city or borough to establish such lines within its jurisdiction prior
to the establishment of lines by the commissioner, provided the commissioner may alter
any lines, however established, upon finding such alterations are necessary to effectuate
the purpose of said sections 22a-342 to 22a-348, inclusive, and section 25-69. If the
commissioner has established lines within a municipality, the commissioner shall have
exclusive jurisdiction over any encroachments within such lines.
Sec. 22a-349. (Formerly Sec. 25-4h). Permitted agricultural use. The provisions of sections 22a-342 to 22a-348, inclusive, shall not be deemed to restrict agricultural or farming uses of lands located within the stream channel encroachment lines
including the building of fences, provided this section shall not apply to farm buildings
and farm structures.
Sec. 22a-349a. General permits for minor activities. Regulations. (a) The Commissioner of Environmental Protection may issue a permit for any minor activity regulated under sections 22a-342 to 22a-349, inclusive, except for any activity covered by
an individual permit, if the commissioner determines that such activity would cause
minimal environmental effects when conducted separately and would cause only minimal cumulative environmental effects, and will not cause any increase in flood heights
or in the potential for flood damage or flood hazards. Such activities may include routine
minor maintenance and routine minor repair of existing structures; replacement of existing culverts; installation of water monitoring equipment, including but not limited to
staff gauges, water recording and water quality testing devices; removal of unauthorized
solid waste; extension of existing culverts and stormwater outfall pipes; placement of
greenhouses or hoophouses lacking concrete foundations; construction of irrigation and
utility lines; and safety improvements with minimal environmental impacts within existing rights-of-way of existing roadways. Any person, firm or corporation conducting
an activity for which a general permit has been issued shall not be required to obtain an
individual permit under any other provision of said sections 22a-342 to 22a-349, inclusive, except as provided in subsection (c) of this section. A general permit shall clearly
define the activity covered thereby and may include such conditions and requirements
as the commissioner deems appropriate, including but not limited to, management practices and verification and reporting requirements. The general permit may require any
person, firm or corporation, conducting any activity under the general permit to report,
on a form prescribed by the commissioner, such activity to the commissioner before it
shall be covered by the general permit. The commissioner shall prepare, and shall annually amend, a list of holders of general permits under this section, which list shall be
made available to the public.
Sec. 22a-350. (Formerly Sec. 25-5). Study of conditions relating to flood control. Said commissioner shall make a comprehensive study of all conditions, wherever
located, in any way relating to: (a) The control of flood waters, the establishment of
encroachment limits along waterways to provide reasonable flood discharge capacity,
the flood control features of existing and future dams and reservoirs, the removal of
stream obstructions caused by flood waters, the extent of damage caused by flood waters
to property of the state, its political subdivisions, industry and agriculture and any necessary means or method by which such damage may be repaired or provided against in
case of future floods; (b) river and harbor improvements, obstructions or encroachments
in any of the navigable waters or tributaries within the state, and (c) any matters kindred
thereto.
Sec. 22a-351. (Formerly Sec. 25-5a). Inventory of groundwater and surface
water resources. Study of water policy needs. (a) The Commissioner of Environmental Protection is authorized to carry out a ten-year program of detailed geological and
hydrological studies and groundwater investigations and reports throughout the state
by means of test drillings, observation wells and any other means necessary to determine
groundwater resources, quality and potential supplies, and establish a complete inventory of groundwater resources of the entire state. The commissioner shall endeavor to
gather and utilize any data or information obtained by any other state or federal agency
or any municipal or private utility with a view toward coordination of all work of such
similar nature.
Sec. 22a-352. (Formerly Sec. 25-5b). Long-range plan for management of water resources. (a) The Department of Environmental Protection, the Department of
Public Health and the Office of Policy and Management, shall establish a continuing
planning process and shall prepare and periodically update jointly a state-wide long-
range plan for the management of the water resources of the state. In carrying out such
preparation the aforesaid agencies shall: (1) Design a unified planning program and
budget; (2) coordinate regional water and sewer facilities plans and provide technical
or financial assistance to regional planning agencies in the preparation of regional water
and sewer facilities plans which are necessary as guidelines for the planning and designing of local and interlocal facilities and which are required by the federal government
as a prerequisite for grants to municipalities for the construction of certain water and
sewer facilities.
Sec. 22a-353. (Formerly Sec. 25-5c). Duties of Secretary of the Office of Policy
and Management. Grants to regional planning agencies. Federal funds. The Secretary of the Office of Policy and Management or his designee shall be the contractor for
the purposes of sections 22a-352 to 22a-354, inclusive, and may engage consultants or
arrange for other technical assistance to implement the work program, and within the
limitations of the budget, developed under subdivision (1) of subsection (a) of section
22a-352. The Secretary of the Office of Policy and Management, or his designee may
make grants to any regional planning agency established under authority of chapter 127,
any regional council of elected officials in any region where there is no regional planning
agency or any regional council of governments organized under sections 4-124i to 4-
124p, inclusive, for the purpose of preparing regional plans for water and sewer facilities.
Such grants may cover retroactively work initiated by a regional planning agency after
January 1, 1967. The Secretary of the Office of Policy and Management or his designee
shall apply for any and all funds available from the federal government to support such
planning work and shall see that regional planning agencies, regional councils of elected
officials or councils of government receiving state grants take similar advantage of
available federal funds in order to reduce expenditure of funds appropriated under section 22a-354, provided utilization of such federal funds shall not unduly delay the conduct of said study.
Sec. 22a-354. (Formerly Sec. 25-5d). Appropriation of bond proceeds. Notwithstanding the provisions of section 22a-446, one million five hundred thousand dollars of the proceeds of the sale of bonds issued under said section may be used at the
discretion of the State Bond Commission for the purpose of sections 22a-352 to 22a-
354, inclusive.
Sec. 22a-354a. "Existing well fields" and "potential well fields", defined. As
used in sections 22a-354b to 22a-354f, inclusive, "existing well fields" means well fields
in use by a public water supply system when mapping is required pursuant to section
22a-354c and "potential well fields" means those well fields identified as future sources
of supply in the water supply plan of the public water supply system approved pursuant
to section 25-32d.
Sec. 22a-354b. Standards for modeling and mapping of locations of aquifers.
The Commissioner of Environmental Protection shall establish standards for two levels
of modeling and mapping of the location in aquifers of well field areas, zones of contribution and recharge areas. Standards for mapping at level A shall be established by regulations adopted by the commissioner in accordance with the provisions of chapter 54,
except that notice of intent to adopt such regulations shall be published on or before
July 1, 1990, and shall be based on hydrogeological data of aquifer geometry, hydraulic
characteristics and connection to surface water features, groundwater level data and
surface water discharge information for model calibration and pump test data for model
verification. Standards for mapping at level B shall be established by guidelines developed by the commissioner and shall be based on existing geologic mapping of known
aquifer characteristics, limited field verification, the location of existing and potential
well fields and pumping rates.
Sec. 22a-354c. Mapping of well fields by water companies. (a) On or before July
1, 1990, each public or private water company serving one thousand or more persons
shall map at level B all areas of contribution and recharge areas for its existing wells
located in stratified drift aquifers. Not later than three years after the adoption by the
Commissioner of Environmental Protection of a model municipal aquifer protection
ordinance under section 22a-354l, each public and private water company serving ten
thousand or more persons shall map at level A all areas of contribution and recharge
areas for its existing wells located in stratified drift aquifers. The Commissioner of
Environmental Protection may map at level A and at level B all areas of contribution
and recharge areas for existing wells located in stratified drift aquifers that are used by
any public or private water company serving less than one thousand persons.
Sec. 22a-354d. Completion of mapping of well fields. The mapping of aquifers
by a public or private water company at level B and level A required pursuant to section
22a-354c shall not be deemed to be complete unless approved by the Commissioner of
Environmental Protection.
Sec. 22a-354e. Inventory of land uses overlying aquifers. Not later than three
months after approval of the Commissioner of Environmental Protection of mapping
of aquifers at level B, each municipal aquifer protection agency authorized pursuant to
section 22a-354o shall inventory land uses overlying the mapped zone of contribution
and recharge areas of such aquifers in accordance with guidelines established by the
commissioner pursuant to section 22a-354f. Such inventory shall be completed not more
than one year after authorization of the agency.
Sec. 22a-354f. Guidelines for inventory. The Commissioner of Environmental
Protection shall develop guidelines to be used by municipal boards or commissions in
conducting the inventory of land uses required under section 22a-354e.
Sec. 22a-354g. Findings. The General Assembly finds that aquifers are an essential natural resource and a major source of public drinking water; that reliance on groundwater will increase because opportunities for development of new surface water supplies
are diminishing due to the rising cost of land and increasingly intense development; that
numerous drinking water wells have been contaminated by certain land use activities
and other wells are now threatened; that protection of existing and future groundwater
supplies demands greater action by state and local government; that a groundwater
protection program requires identification and delineation of present and future water
supplies in stratified drift aquifers supplying drinking water wells; that a comprehensive
and coordinated system of land use regulations should be established that includes state
regulations protecting public drinking water wells located in stratified drift aquifers;
that municipalities with existing or proposed public drinking water wells in stratified
drift aquifers should designate aquifer protection agencies, and that the state should
provide technical assistance and education programs on aquifer protection to ensure a
plentiful supply of public drinking water for present and future generations.
Sec. 22a-354h. Definitions. For the purposes of sections 19a-37, 22-6c, 22a-354c,
22a-354e, 22a-354g to 22a-354bb, inclusive, 25-32d, 25-33h, 25-33n and subsection
(a) of section 25-84:
Sec. 22a-354i. Regulations. (a) On or before July 1, 1991, the Commissioner of
Environmental Protection shall publish notice of intent to adopt regulations in accordance with chapter 54 for land use controls in aquifer protection areas. The regulations
shall establish (1) best management practice standards for existing regulated activities
located entirely or in part within aquifer protection areas and a schedule for compliance
of nonconforming regulated activities with such standards, (2) best management practice
standards for and prohibitions of regulated activities proposed to be located entirely or
in part within aquifer protection areas, (3) procedures for exempting regulated activities
in aquifer protection areas upon determination solely by the commissioner that such
regulated activities do not pose a threat to any existing or potential drinking water supply
and (4) requirements for design and installation of groundwater monitoring within aquifer protection areas. In addition, the commissioner may adopt such other regulations as
deemed necessary to carry out the purposes of sections 22a-354b, 22a-354c, 22a-354h,
this section, sections 22a-354m, 22a-354n, subsection (e) of section 22a-354p and subsection (d) of section 22a-451, including but not limited to regulations which provide
for the manner in which the boundaries of aquifer protection areas shall be established
and amended; criteria and procedures for submission and review of applications to construct or begin regulated activities; procedures for granting, denying, limiting, revoking,
suspending, transferring and modifying permits for regulated activities; controls regarding the expansion of nonconforming regulated activities, including procedures for offsetting impacts from the expansion or modification of nonconforming regulated activities or procedures for modifying permits of regulated activities by the removal of other
potential pollution sources within the subject well field, procedures for the granting of
permits for such expansion or modification based on the certification of a qualified
person that such expansion meets criteria established by the commissioner; registration
requirements for existing regulated activities and procedures for transferring registrations; procedures for landowners to notify a municipality or the commissioner of a
change in use and other provisions for administration of the aquifer protection program.
Sec. 22a-354j. Consistency of aquifer regulations with regulations re farm resources management plans. State regulations for aquifer protection areas adopted by
the Commissioner of Environmental Protection pursuant to section 22a-354i shall be
consistent with regulations adopted by said commissioner for farm resources management plans pursuant to section 22a-354m.
Sec. 22a-354k. Groundwater education program. The Commissioner of Environmental Protection shall develop and implement a groundwater education program.
In developing such program the commissioner shall consult with the Commissioner
of Public Health, water utilities, state educational and research institutions, nonprofit
environmental organizations and any other person or agency the commissioner deems
necessary. The Cooperative Extension Service at The University of Connecticut shall
assist the commissioner in implementation of the program.
Sec. 22a-354l. Model municipal aquifer protection ordinance. Not later than
October 1, 1995, the Commissioner of Environmental Protection shall prepare a model
municipal aquifer protection ordinance, consistent with regulations adopted under section 22a-354i. The ordinance may be considered by municipal aquifer protection agencies in adopting regulations pursuant to section 22a-354p.
Sec. 22a-354m. Farm resources management plans. (a) The Commissioner of
Environmental Protection may, in accordance with regulations adopted pursuant to subsection (d) of this section, require any person engaged in agriculture on land located
within an aquifer protection area and whose annual gross sales from agricultural products
during the preceding calendar year were two thousand five hundred dollars or more to
submit a farm resources management plan.
Sec. 22a-354n. Delineation of aquifer protection areas on maps prepared by
zoning commissions, planning commissions or planning and zoning commissions.
Challenges to boundaries. The zoning commission, planning commission or planning
and zoning commission of each municipality with an aquifer protection area shall, in
accordance with regulations adopted by the commissioner pursuant to section 22a-354i,
delineate on any map showing zoning districts prepared in accordance with chapter 124
or 126 or any special act the boundaries of aquifer protection areas, including areas of
contribution and recharge areas as shown on level A maps approved or done by the
commissioner pursuant to section 22a-354c or any other provision of the general statutes.
An aquifer protection commission shall not delineate or alter the boundary of an aquifer
protection area except in accordance with regulations adopted by the commissioner. No
person may challenge the boundaries of the aquifer protection area at the local level
unless such challenge is based solely on a failure by the aquifer protection agency to
properly delineate the boundaries in accordance with regulations of the commissioner.
Any other challenge to established aquifer protection area boundaries shall be in the
form of a petition to the commissioner to amend the boundaries, in accordance with
regulations adopted by him.
Sec. 22a-354o. Municipal regulation of aquifer protection areas. (a) Each municipality in which an aquifer protection area is located shall authorize by ordinance an
existing board or commission to act as such agency not later than three months after
adoption by the commissioner of regulations for aquifer protection areas pursuant to
section 22a-354i and approval by the commissioner of mapping of areas of contribution
and recharge areas for wells located in stratified drift aquifers in the municipality at
level B pursuant to section 22a-354d. The ordinance authorizing the agency shall determine the number of members and alternate members, the length of their terms, the
method of selection and removal and the manner for filling vacancies. No member or
alternate member of such agency shall participate in any hearing or decision of such
agency of which he is a member upon any matter in which he is directly or indirectly
interested in a personal or financial sense. In the event of disqualification, such fact shall
be entered on the records of the agency and replacement shall be made from alternate
members of an alternate to act as a member of such commission in the hearing and
determination of the particular matter or matters in which the disqualification arose.
Sec. 22a-354p. Adoption of regulations. Permits. (a) The aquifer protection
agency authorized by section 22a-354o shall, by regulation, provide for (1) the manner
in which the boundaries of aquifer protection areas shall be established and amended
or changed, (2) the form for an application to conduct regulated activities within the
area, (3) notice and publication requirements, (4) criteria and procedures for the review
of applications and (5) administration and enforcement.
Sec. 22a-354q. Appeals. (a) The Commissioner of Environmental Protection or
any person aggrieved by any regulation, order, decision or action made pursuant to
sections 22a-354o to 22a-354t, inclusive, or section 14 of public act 89-305* by the
commissioner or municipality, within fifteen days after publication of such regulation,
order, decision or action may appeal to the superior court for the judicial district where
the land affected is located, and if located in more than one judicial district, to said court
in any such judicial district, except if such appeal is from a contested case, as defined
in section 4-166, such appeal shall be in accordance with the provisions of section 4-
183 and venue shall be in the judicial district where the land affected is located, and if
located in more than one judicial district to the court in any such judicial district. Such
appeal shall be made returnable to said court in the same manner as that prescribed for
civil actions brought to said court. Notice of such appeal shall be served upon the aquifer
protection agency and the commissioner. The commissioner may appear as a party to
any action brought by any other person within thirty days from the date such appeal is
returned to the court. The appeal shall state the reasons upon which it is predicated and
shall not stay proceedings on the regulation, order, decision or action, but the court
may, on application and after notice, grant a restraining order. Such appeal shall have
precedence in the order of trial.
Sec. 22a-354r. Findings on appeal. Setting aside or modifying action. Authority to purchase land. (a) If upon appeal pursuant to section 22a-354q, the court finds that
the action appealed from constitutes the equivalent of a taking without compensation, it
shall set aside the action or it may modify the action so that it does not constitute a
taking. In both instances the court shall remand the order to the aquifer protection agency
for action not inconsistent with its decision.
Sec. 22a-354s. Penalty. Court orders. (a) If the aquifer protection agency or its
duly authorized agent finds that any person is conducting or maintaining any activity,
facility or condition which violates any provision of sections 22a-354o to 22a-354t,
inclusive, or section 14 of public act 89-305*, or any regulation or permit adopted or
issued thereunder, the agency or its duly authorized agent may issue a written order
by certified mail, return receipt requested, to such person conducting such activity or
maintaining such facility or condition to cease such activity immediately or to correct
such facility or condition. The agency shall send a copy of such order to any affected
water company by certified mail, return receipt requested. Within ten days of the issuance of such order the agency shall hold a hearing to provide the person an opportunity
to be heard and show cause why the order should not remain in effect. Any affected
water company may testify at the hearing. The agency shall consider the facts presented
at the hearing and, within ten days of the completion of the hearing, notify the person
by certified mail, return receipt requested, that the original order remains in effect, that
a revised order is in effect, or that the order has been withdrawn. The original order
shall be effective upon issuance and shall remain in effect until the agency affirms,
revises or withdraws the order. The issuance of an order pursuant to this section shall
not delay or bar an action pursuant to subsection (b) of this section. The commissioner
may issue orders pursuant to sections 22a-6 to 22a-7, inclusive, concerning an activity,
facility or condition which is in violation of said sections 22a-354o to 22a-354t, inclusive, or section 14 of public act 89-305* if the municipality in which such activity,
facility or condition is located has failed to enforce its aquifer protection regulations.
Sec. 22a-354t. Revocation of municipal authority to regulate aquifer protection areas. (a) The Commissioner of Environmental Protection may revoke the authority
of a municipality to regulate aquifer protection areas pursuant to sections 22a-354o to
22a-354s, inclusive, this section or section 14 of public act 89-305*, upon determination
after a hearing that such municipality has, over a period of time, consistently failed to
perform its duties under said sections. Prior to the hearing on revocation, the commissioner shall send a notice to the aquifer protection agency, by certified mail, return
receipt requested, asking such agency to show cause, within thirty days, why such authority should not be revoked. A copy of the show cause notice shall be sent to the
chief executive officer of the municipality that authorized the agency and to any water
company owning or operating a public water supply well within such municipality. Such
water company may, through a representative, appear and be heard at any such hearing.
The commissioner shall send a notice to the aquifer protection agency, by certified mail,
return receipt requested, stating the reasons for the revocation and the circumstances
for reinstatement. Any municipality aggrieved by a decision of the commissioner under
this section to revoke its authority under said sections 22a-354o to 22a-354s, inclusive,
this section and section 14 of public act 89-305*, may appeal therefrom in accordance
with the provisions of section 4-183. The commissioner shall have jurisdiction over
aquifers in any municipality whose authority to regulate such aquifers has been revoked.
Any costs incurred by the state in reviewing applications to conduct an activity within
an aquifer protection area for such municipality shall be paid by the municipality. Any
fees that would have been paid to such municipality if such authority had been retained
shall be paid to the state.
Sec. 22a-354u. Incentive program for public recognition of users of land
within aquifer protection areas who implement innovative approaches to groundwater protection. The Commissioner of Environmental Protection shall develop an
incentive program to provide public recognition of users of land located within aquifer
protection areas who demonstrate successful and committed efforts to protect drinking
water supplies by implementing innovative approaches to groundwater protection. Such
program shall also promote groundwater protection through education of members of
businesses and industry and the public.
(b) The Commissioner of Environmental Protection is designated as the shore erosion agency of the state for the purpose of cooperating with the Beach Erosion Board
of the Department of Defense, as provided for in Section 2 of the "River and Harbor
Act" adopted by Congress and approved July 3, 1930, and known as H. R. Number
11781 of the second session of the 71st Congress. Said commissioner shall carry out
investigations and studies of conditions along the shore line, harbors, rivers and islands
within the territorial waters of the state in order to promote and encourage the healthful
recreation of its citizens and with a view to devising and projecting economical and
effective methods and works for preventing and correcting shore erosion and damage
to public and private property therefrom and to prevent inundation of improved property
by storms, erosion and ravages of the sea.
(1949 Rev., S. 3567; 1955, S. 1957d; November, 1955, S. N191; 1957, P.A. 364, S. 9; March, 1958, P.A. 20, S. 1;
1961, P.A. 273, S. 2; 1963, P.A. 435, S. 8; 1969, P.A. 768, S. 254; 1971, P.A. 872, S. 40; P.A. 85-142, S. 1; P.A. 93-381,
S. 9, 39; P.A. 95-257, S. 12, 21, 58.)
History: 1961 act amended Subsec. (c) to authorize designated subcommittee to hold hearing; 1963 act repealed Subsec.
(c) which had concerned the designation of areas of waterways as free from obstruction or encroachment by public or
private persons, firms or corporations; 1969 act added provision in Subsec. (a) re recommendations of commissioner of
transportation in matters concerning river and harbor improvements, etc.; 1971 act replaced references to water resources
commission with references to environmental protection commissioner in Subsec. (a); Sec. 25-3 transferred to Sec. 22a-
337 in 1983; P.A. 85-142 amended Subsec. (a) by requiring that the commissioner of health services be consulted; P.A.
93-381 replaced commissioner of health services with commissioner of public health and addiction services, effective July
1, 1993; P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction Services with Commissioner
and Department of Public Health, effective July 1, 1995.
See Secs. 22a-342 to 22a-348 re stream channel encroachment line.
Annotations to former section 25-3:
Cited. 148 C. 591.
General jurisdiction of commission discussed. 21 CS 407.
Annotations to present section:
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 632; February, 1965, P.A. 239, S. 1; 1967, P.A. 545, S. 1; 1971, P.A. 872, S. 41, 42; P.A. 77-164; 77-166;
P.A. 79-108; P.A. 87-492, S. 6, 8.)
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-492, S. 1, 8.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-492, S. 2, 8.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-492, S. 3, 8.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-492, S. 4, 8.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-492, S. 5, 8.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1) Designate a lake located in two or more municipalities to be the subject of a
program of preservation which may serve as a pilot program for the preservation and
enhancement of the historic, cultural, recreational, economic, scenic, public health and
environmental value of lakes in this state;
(2) Encourage partnerships and agreements with municipalities which are contiguous to the lake and, to the greatest extent practicable under law, direct programs, grants
and technical assistance so as to provide environmental support to the lake;
(3) Coordinate state and municipal activities and resources to preserve, protect and
restore the lake and its shoreline;
(4) Provide access to existing scientific data and information relating to the lake,
its shoreline and watershed area to the municipalities in which it is located;
(5) Cooperate with such municipalities to promote and encourage public use and
enjoyment of the resource for all lawful purposes consistent with achievement of the
other goals set forth in this section;
(6) Provide, upon request of such municipalities, an agency representative to whom
they may communicate goals and needs and who shall facilitate communication and
interaction between such municipalities and the state; and
(7) Cooperate with the contiguous municipalities in any efforts to protect and preserve the character of the designated lake as such municipalities may undertake.
(P.A. 99-135, S. 1, 10.)
History: P.A. 99-135 effective July 1, 1999.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 574, S. 3; 1969, P.A. 768, S. 255; 1971, P.A. 872, S. 43.)
History: 1969 act added provisions requiring notification of transportation commissioner and setting forth his powers
and duties re designation of channels and boat basins; 1971 act replaced references to water resources commission with
references to environmental protection commissioner; Sec. 25-3d transferred to Sec. 22a-340 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1949 Rev., S. 3568; 1971, P.A. 872, S. 44.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner; Sec. 25-4 transferred to Sec. 22a-341 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 1; 1971, P.A. 872, S. 45; P.A. 73-590, S. 2, 3; P.A. 90-231, S. 11, 28; P.A. 91-369, S. 26, 36; P.A.
98-209, S. 5.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; P.A. 73-590 clarified applicable waterways as "tidal or inland" and required that findings contain effect of
encroachment upon water storage capacity, floodplains and upon protection and preservation of natural resources and
ecosystems; Sec. 25-4a transferred to Sec. 22a-342 in 1983; P.A. 90-231 required the payment of application fees and
provided that on and after July 1, 1995, the fees shall be prescribed by regulations; P.A. 91-369 restated commissioner's
authority to adopt regulations setting the fees required by this section; P.A. 98-209 prohibited hindrances beyond stream
channel encroachment lines and prohibited maintenance of obstructions, encroachments or hindrances beyond such lines.
See Sec. 7-147 re municipal ordinances.
See Sec. 22a-27i re exemption of municipality for one year.
See Sec. 22a-360 re boundaries for structures.
Annotation to former section 25-4a:
Cited. 179 C. 250, 252.
Annotations to present section:
Cited. 215 C. 616, 618, 619, 621, 622, 625−630, 632. Cited. 235 C. 448, 457. Cited. 239 C. 124.
Cited. 24 CA 163, 166.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 87-438, S. 2; P.A. 88-230, S. 1, 12; 88-364, S. 42, 123; P.A. 90-98, S. 1, 2; P.A. 93-142, S. 4, 7, 8; P.A. 95-220,
S. 4−6; P.A. 98-209, S. 6.)
History: P.A. 88-230 replaced "judicial district of Hartford-New Britain at Hartford" with "judicial district of Hartford",
effective September 1, 1991; P.A. 88-364 made technical change; P.A. 90-98 changed the effective date of P.A. 88-230
from September 1, 1991, to September 1, 1993; P.A. 93-142 changed the effective date of P.A. 88-230 from September
1, 1993, to September 1, 1996, effective June 14, 1993; P.A. 95-220 changed the effective date of P.A. 88-230 from
September 1, 1996, to September 1, 1998, effective July 1, 1995; P.A. 98-209 prohibited maintenance of obstructions,
encroachments or hindrances beyond stream channel encroachment lines without a permit.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 2; 1971, P.A. 872, S. 46.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner; Sec. 25-4b transferred to Sec. 22a-343 in 1983.
Annotation to former section 25-4b:
Cited. 179 C. 250, 252.
Annotations to present section:
Cited. 215 C. 616, 625, 626.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 3; 1971, P.A. 872, S. 47; P.A. 76-436, S. 465, 681; P.A. 77-603, S. 105, 125; P.A. 80-483, S. 162,
186; P.A. 88-230, S. 1, 12; P.A. 90-98, S. 1, 2; P.A. 93-142, S. 4, 7, 8; P.A. 95-220, S. 4−6; P.A. 99-215, S. 24, 29.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner and authorized designated hearing examiners to conduct hearings; P.A. 76-436 replaced court of common
pleas with superior court, effective July 1, 1978; P.A. 77-603 replaced previous appeal provisions with requirement that
appeals be made in accordance with Sec. 4-183, but retained venue in Hartford county; P.A. 80-483 replaced Hartford
county with judicial district of Hartford-New Britain; Sec. 25-4c transferred to Sec. 22a-344 in 1983; P.A. 88-230 replaced
"judicial district of Hartford-New Britain" with "judicial district of Hartford", effective September 1, 1991; P.A. 90-98
changed the effective date of P.A. 88-230 from September 1, 1991, to September 1, 1993; P.A. 93-142 changed the effective
date of P.A. 88-230 from September 1, 1993, to September 1, 1996, effective June 14, 1993; P.A. 95-220 changed the
effective date of P.A. 88-230 from September 1, 1996, to September 1, 1998, effective July 1, 1995; P.A. 99-215 replaced
"judicial district of Hartford" with "judicial district of New Britain", effective June 29, 1999.
See Sec. 52-192 re precedence of appeal.
Annotation to former section 25-4c:
Cited. 179 C. 250, 252.
Annotations to present section:
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 4; 1971, P.A. 872, S. 48.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4d transferred to Sec. 22a-345 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 5; 1971, P.A. 872, S. 49.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4e transferred to Sec. 22a-346 in 1983.
See Sec. 22a-362 re structures or fill.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1963, P.A. 435, S. 6; 1971, P.A. 872, S. 50.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner and added phrase limiting commissioner's power to make and revise regulations and procedures; Sec. 25-4f transferred to Sec. 22a-347 in 1983.
See chapter 54 (Sec. 4-166 et seq.) re administrative procedure.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) Notwithstanding the provisions of subsection (a), any town, city or borough
may establish such lines at any time to comply with the eligibility provisions of the
National Flood Insurance Program (44 CFR Part 59 et seq.).
(1963, P.A. 435, S. 7; 1971, P.A. 872, S. 51; P.A. 84-16; P.A. 88-327, S. 2, 3.)
History: 1971 act replaced references to water resources commission with references to environmental protection
commissioner; Sec. 25-4g transferred to Sec. 22a-348 in 1983; P.A. 84-16 added Subsec. (b) authorizing towns to establish
lines to comply with the National Flood Insurance Program; P.A. 88-327 added provisions to Subsec. (a) re exclusive
jurisdiction of commissioner of environmental protection.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 75-114, S. 1, 2.)
History: Sec. 25-4h transferred to Sec. 22a-349 in 1983.
Cited. 215 C. 616, 618, 621, 622, 625−627, 629−632. Cited. 239 C. 124.
Cited. 24 CA 163, 167.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) Notwithstanding any other procedures specified in said sections 22a-342 to 22a-
349, inclusive, any regulations adopted thereunder, and chapter 54, the commissioner
may issue, revoke, suspend or modify a general permit in accordance with the following
procedures: (1) The commissioner shall publish in a newspaper having a substantial
circulation in the affected area or areas notice of intent to issue a general permit; (2) the
commissioner shall allow a comment period of thirty days following publication of such
notice during which interested persons may submit written comments concerning the
permit to the commissioner and the commissioner shall hold a public hearing if, within
said comment period, he receives a petition signed by at least twenty-five persons; (3)
the commissioner may not issue the general permit until after the comment period; and
(4) the commissioner shall publish notice of any permit issued in a newspaper having
substantial circulation in the affected area or areas. Any person may request that the
commissioner issue, modify or revoke a general permit in accordance with this subsection.
(c) Subsequent to the issuance of a general permit, the commissioner may require
any person, firm or corporation, to apply for an individual permit under the provisions
of said sections 22a-342 to 22a-349, inclusive, for all or any portion of the activities
covered by the general permit, if in the commissioner's judgment the purposes and
policies of such sections would be best served by requiring an application for an individual permit. The commissioner may require an individual permit under this subsection
only if the affected person, firm or corporation has been notified in writing that an
individual permit is required. The notice shall include a brief statement of the reasons
for the decision and a statement that upon the date of issuance of such notice the general
permit as it applies to the individual activity will terminate.
(d) Any general permit issued under this section shall require that any person, firm
or corporation intending to conduct an activity covered by such general permit shall, at
least sixty days before initiating such activity, give written notice of such intention to
the inland wetlands agency, zoning commission, planning commission or combined
planning and zoning commission and conservation commission of any municipality
which will or may be affected by such activity, and to the department which shall make
such notices available to the public. The general permit shall specify the information
which must be contained in the notice. An inland wetlands agency, planning and zoning
commission, conservation commission or any person may submit written comments to
the commissioner concerning such activity not later than twenty-five days prior to the
date that the activity is proposed to begin.
(e) The commissioner may adopt regulations in accordance with the provisions of
chapter 54 to carry out the purposes of this section.
(P.A. 91-263, S. 4, 8; P.A. 92-162, S. 16, 25.)
History: P.A. 92-162 amended Subsec. (d) to provide that any person may submit comments to the commissioner
concerning regulated activities permitted under this section prior to commencement of such activities and changed the
deadline for such comments from thirty days prior to such commencement to twenty-five days.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1949 Rev., S. 3569; November, 1955, S. N192; 1971, P.A. 872, S. 52.)
History: 1971 act replaced reference to water resources commission with reference to environmental protection commissioner; Sec. 25-5 transferred to Sec. 22a-350 in 1983.
Annotation to former section 25-5:
Cited. 21 CS 407.
Annotations to present section:
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) The commissioner is authorized to carry out a program of studies and investigations necessary to establish a complete inventory of surface water resources of the entire
state and shall collect, utilize and coordinate the data and activities of any other state
or federal agency or municipal or private utility or corporation.
(c) The commissioner may negotiate with any property owner such terms,
agreements or contracts as may be necessary or convenient in connection with carrying
out the duties required by this section.
(1959, P.A. 594; 1971, P.A. 872, S. 53.)
History: 1971 act replaced water resources commission with environmental protection commissioner; Sec. 25-5a transferred to Sec. 22a-351 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) The state-wide water resources plan shall: (1) Identify the quantities and qualities of water that could be available to specific areas under feasible distribution; (2)
identify present and projected demands for water for specific areas; (3) recommend the
utilization of the state's water resources, including surface and subsurface water, for
their greatest benefits; (4) make recommendations for such major engineering works
or special districts which may be necessary, including the need, timing and general cost
thereof; (5) recommend land use and other measures where appropriate to insure the
desired quality and abundance of water; (6) take into account desired recreational, agricultural, industrial and commercial use of water bodies; and (7) seek to incorporate
regional and local plans and programs for water use and management and plans for
water and sewerage facilities in the state-wide plan.
(c) Upon completion of each planning document and when adopted by the Commissioner of Environmental Protection, the Commissioner of Public Health and the Secretary of the Office of Policy and Management, said final plan shall be submitted to the
General Assembly.
(1967, P.A. 477, S. 1−3; 1969, P.A. 628, S. 12; 1971, P.A. 872, S. 54; P.A. 73-555, S. 1, 10; 73-679, S. 39, 40, 43; P.A.
75-537, S. 52, 55; P.A. 77-614, S. 19, 323, 610; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58.)
History: 1969 act replaced Connecticut development commission with office of state planning in Subsec. (a), deleted
reference to Connecticut interregional planning program in Subdiv. (1) and replaced the constituent agencies of that program
with water resources commission, commissioner of health, state board of fisheries and game and director of the office of
state planning in Subsec. (c), deleting obsolete provision requiring submission of progress report in lieu of plan if plan is
not completed and approved by January 15, 1969; 1971 act replaced water resources commission with commissioner and
department of environmental protection and deleted references to board of fisheries and game in Subsecs. (a) and (c); P.A.
73-555 clarified that planning process should be continuing and that plan should be updated periodically; P.A. 73-679
replaced office of state planning with planning and budgeting division, department of finance and control and the director
of that office with a division managing director; P.A. 75-537 replaced planning and budgeting division, department of
finance and control and its managing director with commissioner and department of planning and energy policy; P.A. 77-
614 replaced commissioner and department of planning and energy policy with office of policy and management and its
secretary and, effective January 1, 1979, replaced commissioner and department of health with commissioner and department of health services; Sec. 25-5b transferred to Sec. 22a-352 in 1983; P.A. 93-381 replaced department and commissioner
of health services with department and commissioner of public health and addiction services, effective July 1, 1993;
P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction Services with Commissioner and
Department of Public Health, effective July 1, 1995.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1967, P.A. 477, S. 4; 1969, P.A. 628, S. 13; P.A. 73-679, S. 41, 43; P.A. 75-537, S. 53, 55; P.A. 77-614, S. 19, 610.)
History: 1969 act transferred powers formerly held by Connecticut development commission to director of the office
of state planning contingent upon approval of commissioner of finance and control; P.A. 73-679 replaced director of the
office of state planning with managing director, planning and budgeting division, department of finance and control or his
designee and made provisions applicable to regional councils of elected officials or regional councils of government; P.A.
75-537 replaced managing director, planning and budgeting division, department of finance and control with commissioner
of planning and energy policy; P.A. 77-614 replaced commissioner of planning and energy policy with secretary of the
office of policy and management; Sec. 25-5c transferred to Sec. 22a-353 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(1967, P.A. 477, S. 5.)
History: Sec. 25-5d transferred to Sec. 22a-354 in 1983.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 88-324, S. 1.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 88-324, S. 2; P.A. 90-275, S. 7, 9.)
History: P.A. 90-275 required the notice of intent to adopt the regulations to be published on or before July 1, 1990.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) Each public or private water company serving ten thousand or more persons
shall map all areas of contribution and recharge areas for potential wells that are located
within stratified drift aquifers identified as future sources of water supply to meet their
needs in accordance with the plan submitted pursuant to section 25-33h, (1) at level B
two years after approval of such plan and (2) at level A four years after approval of
such plan. The Commissioner of Environmental Protection shall identify and make
recommendations for mapping, or shall map, all remaining significant areas of contribution and recharge areas for potential wells located in stratified drift aquifers not identified
by a public or private water company as a potential source of water supply within the
region of an approved plan. Mapping of any other area of contribution and recharge
areas for potential wells located in stratified drift aquifers by the commissioner shall be
completed at a time determined by the commissioner.
(P.A. 88-324, S. 3; P.A. 89-305, S. 22, 32; P.A. 90-275, S. 5, 9; P.A. 91-386, S. 1; May Sp. Sess. P.A. 92-11, S. 63,
70; P.A. 93-337, S. 3.)
History: P.A. 89-305 specified that mapping is required of areas of contribution and recharge areas for wells located
in stratified drift aquifers and made technical changes; P.A. 90-275 deleted the requirement that the areas to be mapped
at level B by water companies be within their water supply service area, authorized the commissioner to map at level A
and at level B areas of contribution and recharge areas for wells located in stratified drift aquifers which are used by water
companies serving less than one thousand persons and required the commissioner to either map or make recommendations
for mapping all remaining significant areas of contribution and recharge areas for potential wells located in stratified drift
aquifers not identified by water companies as a potential source of water supply; P.A. 91-386 amended Subsec. (a) to
extend the time for mapping at level A from July 1, 1992, to July 1, 1994; May Sp. Sess. P.A. 92-11 amended Subsec. (a)
to change date from July 1, 1994, to January 1, 1996, for aquifer mapping; P.A. 93-337 amended Subsec. (a) to change
deadline for mapping from January 1, 1996, to three years after adoption by commissioner of model ordinance under Sec.
22a-354l.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 88-324, S. 4.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 88-324, S. 5; P.A. 89-305, S. 27, 32.)
History: P.A. 89-305 required inventory to be completed within a year of agency authorization and made technical
changes.
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 88-324, S. 6.)
Cited. 215 C. 616, 625.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 1, 32.)
(Return to TOC) (Return to Chapters) (Return to Titles)
(1) "Regulated activity" means any action, process or condition which the Commissioner of Environmental Protection determines, by regulations adopted in accordance
with section 22a-354i, to involve the production, handling, use, storage or disposal of
material that may pose a threat to groundwater in an aquifer protection area, including
structures and appurtenances utilized in conjunction with the regulated activity;
(2) "Commissioner" means the Commissioner of Environmental Protection;
(3) "Well field" means the immediate area surrounding a public drinking water
supply well or group of wells;
(4) "Area of contribution" means the area where the water table or other potentiometric surface is lowered due to the pumping of a well and groundwater flows directly
to the well;
(5) "Recharge area" means the area from which groundwater flows directly to the
area of contribution;
(6) "Aquifer" means a geologic formation, group of formations or part of a formation that contains sufficient saturated, permeable materials to yield significant quantities
of water to wells and springs;
(7) "Affected water company" means any public or private water company owning
or operating a public water supply well within an aquifer protection area;
(8) "Stratified drift" means a predominantly sorted sediment laid down by or in
meltwater from glaciers and includes sand, gravel, silt and clay arranged in layers;
(9) "Municipality" means any town, consolidated town and city, consolidated town
and borough, city or borough;
(10) "Aquifer protection area" means any area consisting of well fields, areas of
contribution and recharge areas, identified on maps approved by the Commissioner of
Environmental Protection pursuant to sections 22a-354b to 22a-354d, inclusive, within
which land uses or activities shall be required to comply with regulations adopted pursuant to section 22a-354o by the municipality where the aquifer protection area is located; and
(11) "Best management practice" means a practice, procedure or facility designed
to prevent, minimize or control spills, leaks or other releases that pose a threat to groundwater.
(P.A. 89-305, S. 2, 32; P.A. 90-275, S. 1, 9; P.A. 95-218, S. 5.)
History: P.A. 90-275 redefined "regulated activity" to include a condition which may pose a threat to groundwater and
specified that the threatened groundwater must be in an aquifer protection area; P.A. 95-218 redefined "area of contribution"
to include other potentiometric surfaces in the location of such areas.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) In adopting such regulations, the commissioner shall consider the guidelines
for aquifer protection areas recommended in the report prepared pursuant to special act
87-63, as amended, and shall avoid duplication and inconsistency with other state or
federal laws and regulations affecting aquifers. The regulations shall be developed in
consultation with an advisory committee appointed by the commissioner. The advisory
committee shall include the Commissioners of Public Works and Public Health and the
chairperson of the Public Utilities Control Authority, or their designees, members of
the public, and representatives of businesses affected by the regulations, agriculture,
environmental groups, municipal officers and water companies.
(P.A. 89-305, S. 3, 32; P.A. 90-275, S. 2, 9; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58; P.A. 98-209, S. 9.)
History: P.A. 90-275 amended Subsec. (a) to require publication of the notice of intent on or before July 1, 1991,
and authorized the commissioner to adopt other regulations; P.A. 93-381 replaced commissioner of health services with
commissioner of public health and addiction services, effective July 1, 1993; P.A. 95-257 replaced Commissioner and
Department of Public Health and Addiction Services with Commissioner and Department of Public Health, effective July
1, 1995; P.A. 98-209 amended Subsec. (a) to authorize provision in regulations for procedures for offsetting nonconforming
regulated activities.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 31, 32.)
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 4, 32; P.A. 93-381, S. 9, 39; P.A. 95-257, S. 12, 21, 58.)
History: P.A. 93-381 replaced commissioner of health services with commissioner of public health and addiction
services, effective July 1, 1993; P.A. 95-257 replaced Commissioner and Department of Public Health and Addiction
Services with Commissioner and Department of Public Health, effective July 1, 1995.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 5, 32; P.A. 93-337, S. 1.)
History: P.A. 93-337 added a deadline of October 1, 1995, for adoption of a model ordinance.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) The soil and water conservation district where the aquifer protection area is
located shall establish and coordinate a technical team to develop each plan. Such team
shall include a representative of the municipality in which the land is located and a
representative of any affected water company upon request of such municipality or water
company. For the purposes of developing the plan required pursuant to this section, if
a farm is located in two or more soil and water conservation districts, the district in
which the greater part of such farm is located shall be deemed to be the district in
which the entire farm is located. In developing a plan, a district shall consult with the
Commissioners of Environmental Protection and Agriculture, the College of Agriculture and Natural Resources at The University of Connecticut, the Connecticut Agricultural Experiment Station, the Soil Conservation Service, the state Agricultural and Conservation Committee and any other person or agency the district deems appropriate.
(c) The plan shall include a schedule for implementation and shall be periodically
updated as required by the commissioner. In developing a schedule for implementation,
the technical team shall consider technical and economic factors including, but not
limited to, the availability of state and federal funds. Any person engaged in agriculture
in substantial compliance with a plan approved under this section shall be exempt from
regulations adopted under section 22a-354o by a municipality in which the land is located. No plan shall be required to be submitted to the commissioner before July 1,
1992, or six months after completion of level B mapping where the farm is located,
whichever is later.
(d) On or before July 1, 1999, the Commissioner of Environmental Protection, in
consultation with the Commissioner of Agriculture, the United States Soil Conservation
Service, the Cooperative Extension Service at The University of Connecticut and the
Council for Soil and Water Conservation, shall publish notice of intent to adopt regulations in accordance with chapter 54 for farm resources management plans. Such regulations shall include, but not be limited to, a priority system and procedures for determining
if a farm management plan is required and the priority that is assigned to the preparation
of such a plan, best management practices, restrictions and prohibitions for manure
management, storage and handling of pesticides, reduced use of pesticides through pest
management practices, integrated pest management, fertilizer management and underground and above-ground storage tanks and criteria and procedures for submission and
review of farm resources management plans and amendments of such plans. In adopting
such best management practices, restrictions and prohibitions, the commissioner shall
consider existing state and federal guidelines or regulations affecting aquifers and agricultural resources management.
(P.A. 89-305, S. 6, 32; P.A. 90-275, S. 3, 9; P.A. 98-209, S. 10.)
History: P.A. 90-275 increased the annual gross sales requirement from one thousand to two thousand five hundred
dollars, provided if a farm is located in two or more districts that the district in which the greater part of the farm is located
shall be deemed to be the district in which the entire farm is located, extended the earliest time in which a plan is required
to July 1, 1992, provided that the commissioner shall publish notice of intent to adopt regulations concerning farm resources
management plans on or before July 1, 1991, and required the regulations to include best management practices, restrictions
and prohibitions for designated items; P.A. 98-209 amended Subsec. (a) to make submittal of farm resources management
plans discretionary on the part of the commissioner, and amended Subsec. (d) to extend the date for notice of intent to
adopt regulations under this section and to authorize certain priorities within such regulations.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 7, 32; P.A. 90-275, S. 4, 9.)
History: P.A. 90-275 provided that the delineation of the boundaries of aquifer protection areas be in accordance with
regulations, provided that the only ground for challenging the boundaries of the aquifer protection area be that the agency
failed to delineate such in accordance with regulations and specified that any other challenge to established boundaries
shall be a petition to amend the boundaries.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) Not more than six months after approval by the commissioner of mapping at
level A, pursuant to section 22a-354d, the aquifer protection agency of the municipality
in which such aquifer protection area is located shall adopt regulations for aquifer protection.
(c) At least one member of the agency or staff of the agency shall be a person who
has completed the course in technical training formulated by the commissioner pursuant
to section 22a-354v. Failure to have a member of the agency or staff with training shall
not affect the validity of any action of the agency and shall be grounds for revocation
of the authority of the agency under section 22a-354t.
(P.A. 89-305, S. 8, 32; P.A. 95-218, S. 6.)
History: P.A. 95-218 amended Subsec. (b) to change "well" to "aquifer protection area" for consistency in the text.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) No regulations of an aquifer protection agency shall become effective or be
established until after a public hearing in relation thereto is held by the agency at which
parties in interest and citizens shall have an opportunity to be heard. Notice of the time
and place of such hearing shall be published in the form of a legal advertisement, appearing at least twice in a newspaper having a substantial circulation in the municipality
at intervals of not less than two days, the first not more than twenty-five days nor less
than fifteen days, and the last not less than two days, before such hearing, and a copy
of such proposed regulation shall be filed in the office of the town, city or borough clerk,
as the case may be, in such municipality, for public inspection at least ten days before
such hearing, and may be published in full in such paper. A copy of the notice and the
proposed regulations or amendments thereto shall be provided to the Commissioner of
Environmental Protection, the town clerk and any affected water company at least thirty-
five days before such hearing. Such regulations may be from time to time amended,
changed or repealed after a public hearing in relation thereto is held by the agency at
which parties in interest and citizens shall have an opportunity to be heard and for which
notice shall be published in the manner specified in this subsection. Regulations or
changes therein shall become effective at such time as is fixed by the agency, provided
a copy of such regulation or change shall be filed in the office of the town, city or
borough clerk, as the case may be. Whenever an agency makes a change in regulations,
it shall state upon its records the reason why the change was made. All petitions submitted
in writing and in a form prescribed by the agency requesting a change in the regulations
shall be considered at a public hearing in the manner provided for establishment of such
regulations within ninety days after receipt of such petition. The agency shall act upon
the changes requested in the petition within sixty days after the hearing. The petitioner
may consent to extension of the periods provided for a hearing and for adoption or denial
or may withdraw such petition.
(c) Pursuant to municipal regulations adopted under subsection (b) of this section,
no regulated activity shall be conducted within any aquifer protection area without a
permit. Any person proposing to conduct or cause to be conducted a regulated activity
within an aquifer protection area shall file an application with the aquifer protection
agency of each municipality wherein the aquifer in question is located. The application
shall be in such form and contain such information as the agency may prescribe. The
day of receipt of an application shall be the day of the next regularly scheduled meeting
of such agency, immediately following the day of submission to such agency or its agent
of such application, provided such meeting is no earlier than three business days after
receipt, or within thirty-five days after such submission, whichever is sooner. No later
than sixty-five days after the receipt of such application, the agency may hold a public
hearing on such application. Notice of the hearing shall be published at least twice at
intervals of not less than two days, the first not more than fifteen days and not fewer
than ten days, and the last not less than two days before the date set for the hearing in
a newspaper having a general circulation in each town where the affected aquifer, or
any part thereof, is located. The agency shall send to any affected water company, at
least ten days before the hearing, a copy of the notice by certified mail, return receipt
requested. All applications, maps and documents relating thereto shall be open for public
inspection. At such hearing any person or persons may appear and be heard. The hearing
shall be completed within forty-five days of its commencement. Action shall be taken
on applications within thirty-five days after the completion of a public hearing or in
the absence of a public hearing within sixty-five days from the date of receipt of the
application.
(d) In granting, denying or limiting any permit for a regulated activity the aquifer
protection agency shall state upon the record the reason for its decision. In granting a
permit the agency may grant the application as filed or grant it upon such terms, conditions, limitations or modifications of the activity intended to carry out the policies of
section 22a-354g. No person shall conduct any regulated activity within an aquifer
protection area which requires zoning or subdivision approval without first having obtained a valid certificate of zoning or subdivision approval, special permit, special exception or variance, or other documentation establishing that the proposal complies with
the zoning or subdivision requirements adopted by the municipality pursuant to chapters
124 to 126, inclusive, or any special act. The agency may suspend or revoke a permit
if it finds, after giving notice to the permittee of the facts or conduct which warrants the
intended action and after a hearing at which the permittee is given an opportunity to
show compliance with the requirements for retention of the permit, that the applicant
has not complied with the conditions or limitations set forth in the permit or has exceeded
the scope of the work as set forth in the application. The agency shall send to any affected
water company a copy of the notice at least ten days before the hearing by certified mail,
return receipt requested. Any affected water company may, through a representative,
appear and be heard at any such hearing. The applicant or permittee shall be notified of
the agency's decision by certified mail, return receipt requested, within fifteen days of
the date of the decision and the agency shall cause notice of its order in issuance, denial,
revocation or suspension of a permit to be published in a newspaper having a general
circulation in the municipality in which the aquifer protection area is located.
(e) The aquifer protection agency may require a filing fee to be deposited with
the agency. The amount of such fee shall be sufficient to cover the reasonable cost of
reviewing and acting on applications and petitions, including, but not limited to, the
costs of certified mailings, publications of notices and decisions, and monitoring compliance with permit conditions, regulations adopted pursuant to sections 19a-37, 22-6c,
22a-354c, 22a-354e, 22a-354g to 22a-354bb, inclusive, 25-32d, 25-33h, 25-33n and
subsection (a) of section 25-84, or agency orders.
(f) Any regulations adopted by an agency under this section shall not be effective
unless the Commissioner of Environmental Protection determines that such regulations
are reasonably related to the purpose of groundwater protection and not inconsistent
with the regulations adopted pursuant to section 22a-354i. A regulation adopted by a
municipality shall not be deemed inconsistent if such regulation establishes a greater
level of protection. The commissioner shall provide written notification to the agency
of approval or the reasons such regulations cannot be approved within sixty days of
receipt by the commissioner of the regulations adopted by the agency.
(g) (1) Nothwithstanding any other provision of the general statutes, the commissioner shall have sole authority to grant, deny, limit or modify, in accordance with
regulations adopted by him, a permit for any regulated activity in an aquifer protection
area proposed by (A) any person to whom the commissioner has issued an individual
permit under the national pollutant discharge elimination system of the federal Clean
Water Act (33 USC 1251 et seq.) or under the state pollutant discharge elimination
system pursuant to section 22a-430 or any person to whom the commissioner has issued
a permit under the provisions of the federal Resource Conservation and Recovery Act
(42 USC 6901 et seq.) for a treatment, storage or disposal facility, (B) any public service
company, as defined in section 16-1, providing gas, electric, pipeline, water or telephone
service, (C) any large quantity generator, as defined in regulations adopted by the commissioner under section 22a-449, or (D) any state department, agency or instrumentality,
except any local or regional board of education. Such authority may be exercised only
after an advisory decision on such permit has been rendered to the commissioner by the
aquifer protection agency of the municipality within which such aquifer protection area
is located or thirty-five days after receipt by the commissioner of the application for
such permit, whichever occurs first. The commissioner shall provide prompt notice of
receipt of an application to the municipal aquifer protection agency.
(2) If the commissioner requires the submission of a registration or other document
under regulations adopted pursuant to section 22a-354i, such submission shall be made
to the commissioner by any person to whom the commissioner has issued an individual
permit under the national pollutant discharge elimination system of the federal Clean
Water Act, or an individual permit under the state pollutant discharge elimination system
pursuant to section 22a-430, or by any person to whom the commissioner has issued a
permit under the provisions of the federal Resource Conservation and Recovery Act for
a treatment, storage or disposal facility, or any public service company, as defined in
section 16-1, providing gas, electric, pipeline, water or telephone service, or a large
quantity generator, as defined in regulations adopted by the commissioner under section
22a-449, or any state department, agency or instrumentality, except any local or regional
board of education.
(P.A. 89-305, S. 9, 32; P.A. 90-275, S. 8, 9; P.A. 92-162, S. 8, 25; P.A. 97-124, S. 6, 16.)
History: P.A. 90-275 in Subsec. (e) required the amount of the filing fee to be sufficient to cover costs of monitoring
compliance with regulations; P.A. 92-162 added Subsec. (g) re authority of commissioner re permits for state agencies for
regulated activities in an aquifer protection area; P.A. 97-124 amended Subsec. (g) by designating existing provisions as
Subdiv. (1) and adding new Subparas. (A) to (C), inclusive, providing that the commissioner shall have the authority to
issue permits under this section to utilities and certain other companies, and by adding new Subdiv. (2) re submission of
registration or other document, effective June 6, 1997.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) The court, upon the motion of the person who applied for such order, decision
or action, shall make such person a party defendant in the appeal. Such defendant may,
at any time after the return date of such appeal, make a motion to dismiss the appeal.
At the hearing on such motion to dismiss, each appellant shall have the burden of proving
his standing to bring the appeal. The court may, upon the record, grant or deny the
motion. The court's order on such motion shall be a final judgment for the purpose of
the appeal as to each such defendant. No appeal may be taken from any such order
except within seven days of the entry of such order.
(c) No appeal taken under subsection (a) of this section shall be withdrawn and no
settlement between the parties to any such appeal shall be effective unless and until a
hearing has been held before the Superior Court and such court has approved such
proposed withdrawal or settlement.
(P.A. 89-305, S. 10, 32.)
*Note: Section 14 of public act 89-305 is special in nature and therefore has not been codified but remains in full force
and effect according to its terms.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) To carry out the purposes of sections 22a-354o to 22a-354t, inclusive, or section
14 of public act 89-305*, a municipality may at any time purchase land or an interest
in land in fee simple or other acceptable title, or subject to acceptable restrictions or
exceptions, and enter into covenants and agreements with landowners.
(P.A. 89-305, S. 11, 32.)
*Note: Section 14 of public act 89-305 is special in nature and therefore has not been codified but remains in full force
and effect according to its terms.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) Any person who commits, takes part in, or assists in any violation of any provision of sections 22a-354o to 22a-354t, inclusive, or section 14 of public act 89-305* or
any ordinance or regulation promulgated by municipalities pursuant to the grant of
authority herein contained, shall be assessed a civil penalty of not more than one thousand dollars for each offense. Each violation of said sections shall be a separate and
distinct offense, and, in the case of a continuing violation, each day's continuance thereof
shall be deemed to be a separate and distinct offense. The Superior Court, in an action
brought by the commissioner, municipality, district or any person shall have jurisdiction
to restrain a continuing violation of said sections, to issue orders directing that the violation be corrected or removed, and to assess civil penalties pursuant to this section. All
costs, fees and expenses in connection with such action shall be assessed as damages
against the violator together with reasonable attorney's fees which may be allowed, all
of which shall be awarded to the municipality, district or person bringing such action.
(c) Any person who wilfully or knowingly violates any provision of sections 22a-
354o to 22a-354t, inclusive, or section 14 of public act 89-305* shall be fined not more
than one thousand dollars for each day during which such violation continues or be
imprisoned not more than six months or both. For a subsequent violation, such person
shall be fined not more than two thousand dollars for each day during which such violation continues or be imprisoned not more than one year or both. For the purposes of this
subsection, "person" shall be construed to include any responsible corporate officer.
(P.A. 89-305, S. 12, 32.)
*Note: Section 14 of public act 89-305 is special in nature and therefore has not been codified but remains in full force
and effect according to its terms.
(Return to TOC) (Return to Chapters) (Return to Titles)
(b) The commissioner shall cause to be published notice of the revocation or reinstatement of the authority of a municipality to regulate aquifers in a newspaper of general
circulation in the area of such municipality.
(c) The commissioner shall adopt regulations in accordance with the provisions of
chapter 54 establishing standards for the revocation and reinstatement of municipal
authority to regulate aquifers pursuant to section 22a-354o.
(P.A. 89-305, S. 13, 32.)
*Note: Section 14 of public act 89-305 is special in nature and therefore has not been codified but remains in full force
and effect according to its terms.
(Return to TOC) (Return to Chapters) (Return to Titles)
(P.A. 89-305, S. 15, 32.)